Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArkle Res Regulatory News (ARK)

Share Price Information for Arkle Res (ARK)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.275
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.05 (20.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.275
ARK Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update

21 Jun 2010 08:39

RNS Number : 9291N
Connemara Mining Company plc
21 June 2010
 



21st June, 2010

 

Connemara Mining Company plc

 

High Grade Zinc-Lead Mineralisation Intersected 400m to the Southwest of the Stonepark North discovery in Limerick.

 

·; Hole 53, drilling 400 metres (m) southwest of the Stonepark North discovery intersected high grade zinc/lead that returned 6.85m grading 10.47% zinc and 3.68% lead from 209.4m depth, including 2.75m at 19.76% zinc and 6.99% lead.

 

·; Hole 51, drilling 150m southwest of hole 53, intersected 7.55m at 4.88% zinc and 1.49% lead from 221.4m including, 1.0m at 21.90% zinc and 7.26% lead.

 

·; Both holes intersected mineralisation at similar depths to the discovery holes at Stonepark North.

 

·; Drilling is ongoing with two rigs on site.

 

Connemara Mining (AIM:Conn), the AIM listed Irish zinc explorer, is pleased to report additional results from the ongoing drilling programme in Limerick. The programme is a joint venture with and operated by Teck Ireland Ltd., a subsidiary of Teck Resources Limited - Canada's largest diversified mining company.

 

Recent drilling, approximately 400m to the southwest of the Stonepark North discovery zone, intersected additional high grade zinc-lead mineralisation. These new intersections are of a similar style, and occur at a similar depth, to the previously reported intersections at Stonepark North - suggesting either a significant extension to the Stonepark North zone or the discovery of a new zone.

 

Hole 53 intersected 6.85m at 10.47% zinc and 3.68% lead from 209.4m, including a high-grade 2.75m interval at 19.76% zinc and 6.99% lead from 212.8m (see Table 1). Hole 53 is located approximately 400m west of hole 26 (reported on September 4th,2009).

 

Hole 51 was drilled approximately 150 m south of hole 53 and intersected 7.55m at 4.88% zinc and 1.49% lead from 221.4m, including a 1.0m interval at 21.90% zinc and 7.26% lead from 224.05m.

 

The earlier reported results from Stonepark North defined a flat-lying zone of zinc-lead mineralization with a strike length of at least 500 metres in a north-south direction. The zone is located approximately 2 km north of the original Stonepark discovery and appears to represent the shallower, up-dip portion of a larger mineralizing system. The results outlined above either significantly extend this zone or are part of a new zone.

 

Recent drilling results are summarised in Table 1.

 

Table 1: Stonepark North Drilling Highlights

 

Hole ID

From (m)

To (m)

Thickness1 (m)

zinc (%)

lead (%)

TC-2638-053

209.4

216.25

6.85

10.47

3.68

Including:

TC-2638-053

212.80

215.55

2.75

19.76

6.99

TC-2638-051

221.40

228.95

7.55

4.88

1.49

Including:

TC-2638-051

224.05

225.05

1.00

21.90

7.26

 TC-2638-0452

209.10

216.55

7.45

19.24

8.52

Including:

TC-2638-0452

211.85

216.10

4.25

26.64

12.30

TC-2638-0382

251.40

253.20

1.80

5.65

0.91

TC-2638-0363

202.70

208.05

5.35

13.22

3.18

TC-2638-0324

207.60

215.40

7.80

5.18

2.68

Including:

TC-2638-0324

214.05

215.40

1.35

10.40

2.16

TC-3638-0265

216.05

223.35

7.20

13.07

2.23

 

1All drill holes are vertical (-90 degrees). 2Reported April 23rd, 2010. 3Reported March 2nd, 2010. 4Reported January 20th, 2010. 5Reported Sept. 4th, 2009.

Two drill rigs are currently on site and approximately 10,000 metres of diamond drilling is planned for 2010.

 

John Teeling, Chairman of Connemara Mining, said "The Stonepark discovery in Limerick is getting bigger and better. The latest drilling results either show a significant extension of Stonepark North or the discovery of a new zone. The fact that these high grade results are at the same depth as Stonepark North and of similar geological character suggests an extension. While it is still early days the evidence is pointing toward a significant orebody at Stonepark/Stonepark North."

 

This release has been approved by Graham Reid, P. Geo., Director BRG Technical Services, consultants to Connemara. Mr. Reid has 30 years mineral exploration and evaluation experience.

 

Enquiries:

Connemara Mining Company Plc

John Teeling, Chairman

+353 (0)1 833 2833

Jim Finn, Financial Director

Smith & Williamson Corporate Finance

Nick Reeve

+44 (0) 117 3762213

Barrie Newton

+44 (0) 117 3762213

College Hill

Nick Elwes

+44 (0) 207 457 2020

 

www.connemaramining.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLIFVDRTILFII
Date   Source Headline
19th Oct 20118:16 amRNSJoint Venture Agreement
22nd Sep 20117:00 amRNSInterim Report
8th Sep 20117:00 amRNSExploration Update
28th Jul 20113:52 pmRNSResult of AGM
30th Jun 20117:00 amRNSAnnual Report and Accounts
28th Jun 20117:00 amRNSChange of Adviser
22nd Jun 20117:00 amRNSFinal Results
25th May 20117:00 amRNSDrilling Update
31st Mar 201111:19 amRNSTotal Voting Rights
14th Mar 20117:00 amRNSDrilling Update
25th Feb 20117:00 amRNSPlacing of new shares
24th Feb 20117:00 amRNSDrilling Update
15th Dec 20107:00 amRNSDrilling Update
30th Sep 20107:00 amRNSHalf Yearly Report
27th Jul 201011:37 amRNSTR-1: Notification of major interest in shares
26th Jul 20104:51 pmRNSChange of Adviser
26th Jul 20102:56 pmRNSTotal Voting Rights
26th Jul 201012:00 pmRNSAGM Statement
20th Jul 20107:00 amRNSDrilling Update
9th Jul 201012:26 pmRNSIssue of Equity
30th Jun 201010:01 amRNSAnnual Report and Accounts
24th Jun 20107:00 amRNSFinal Results
21st Jun 20108:39 amRNSDrilling Update
8th Jun 20103:25 pmRNSDirectorate Change
23rd Apr 20107:00 amRNSDrilling Update
2nd Mar 20107:00 amRNSDrilling Update
20th Jan 20107:00 amRNSDrilling Update
9th Oct 20095:14 pmRNSOffer Update
25th Sep 20095:58 pmRNSOffer Update
23rd Sep 20097:00 amRNSHalf Yearly Report
21st Sep 20097:00 amRNSOffer Update
16th Sep 20093:51 pmRNSDirectorate Change
16th Sep 20091:22 pmRNSApplication for cancellation of listing
16th Sep 20097:00 amRNSOffer Wholly Unconditional
11th Sep 20094:58 pmRNSOffer Update
4th Sep 20097:00 amRNSDrilling Update
25th Aug 20097:00 amBUSHolding(s) in Company
21st Aug 20094:34 pmRNSOffer Document Posted
19th Aug 200912:03 pmPRNRule 8.1 - Arc International Plc
18th Aug 20097:00 amRNSRecommended Cash Offer
12th Aug 200910:03 amBUSRule 8.3 - Arc International
11th Aug 200910:07 amBUSRule 8.3 - Arc International
7th Aug 200911:02 amBUSRule 8.3 - Arc International
5th Aug 20097:00 amRNSInterim Results
4th Aug 20091:07 pmRNSRule 8.3- Arc International Plc
4th Aug 20099:00 amRNSARC & Sitel Collaboration
30th Jul 20092:11 pmRNSRule 8.3- ARC International Plc
29th Jul 20094:35 pmRNSPrice Monitoring Extension
29th Jul 200911:44 amRNSStmnt re Share Price Movement
28th Jul 20099:00 amRNSUniversity of Edinburgh Development

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.