If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArkle Res Regulatory News (ARK)

Share Price Information for Arkle Res (ARK)

Share Price is delayed by 15 minutes
Get Live Data
0.675    0.00 (0.00%)
Bid:
0.65
Ask:
0.70
Spread: 0.05 (7.692%)
Market Cap: £10.77m
ARK Live PriceLast checked at - London Stock Exchange

Intraday Arkle Res Share Chart

Drilling Report

9 Apr 2008 07:00

Connemara Mining Company plc09 April 2008 9th April 2008 Connemara Mining Company Plc Exploration Update on Lough Sheelin Zinc Lead Prospect Highlights: • Positive initial results extend drilling programme from 5 to 11 holes • Low to medium grade mineralisation observed in most holes • Results of two holes received to date show grades of 4.35% Zinc and 2.32% Lead over 0.45m in one hole and 1.15m of 6.4% Zinc and 0.99% Lead in the other • Grades improving through programme - moving closer to source of mineralisation The Directors of Connemara (AIM:CONN) are pleased to update shareholders ontheir Lough Sheelin exploration activities. Connemara has completed an 11-holewidely spaced drilling programme at Lough Sheelin in Cavan. The programme was originally intended to be 5 holes but positive indicationsextended the drilling. To date results have been obtained for two holes, fiveare in the laboratory and two are in sample preparation, one hole missed thetarget and one hole was barren. Hole C-3925-1 has an interval of 4.35% Zinc and2.32% Lead over 0.45m. Hole C-3925-5 has low to medium grade Zinc/Leadmineralisation over 5 metres including 1.15 metres of 6.4 % Zinc and 0.99% Lead. As the drilling proceeded the mineralisation improved. The last three holes, yetto be analysed, appear to contain significant grade and thickness ofmineralisation. The style of mineralisation intersected is a combination of disseminated andfracture fill sphalerite and galena. The grade and style of mineralisation arewhat would be expected to be encountered within an area contiguous to a deposit. The Lough Sheelin property consists of five contiguous prospecting licencescovering an area of approximately 170.76 km2 of Counties Meath and Cavan innorth-central Ireland. The block is located approximately 25km west of thec.100Mt Navan Deposit, which is currently owned and operated by New Boliden-TaraMines Ltd. The geology of the Lough Sheelin area is strongly analogous to Navan,with the target horizons consisting of a cyclical sequence of limestones, shaleand sandstone. The Connemara Lough Sheelin block is situated at the intersectionpoint of two major structural trends (the Longford-Down and theTynagh-Ballinalack Trends), which is considered to be highly prospective. John Teeling, Chairman, commented; "We are very excited with our drilling at Lough Sheelin. Historic data led us toexpect to encounter Zinc, but we are pleased with the extent and type ofmineralisation. The original 5-hole programme was repeatedly extended to followthe discovery. The good news in this story is that the mineralisation is open and we have notyet discovered the source - although we appear to be moving closer to it. Thelesson from the discovery of the SWEX (Southwest Extension) Zone at the Navanmine, some 20km away is that low grade pervasive halos can be important and mustbe followed along to the feeder systems. On receipt and analysis of the remaining drill results we will decide on afollow up programme." This release has been approved by Graham Reid, P. Geo., Director BRG TechnicalServices, consultants to Connemara. Mr. Reid has 30 years mineral explorationand evaluation experience. Contacts: Connemara Mining Company PlcJohn Teeling, Chairman +353 1 833 2833Jim Finn, Financial Director Blue Oar Securities PlcJohn Wakefield +44 (0) 117 933 0020Simon Moynagh College HillPaddy Blewer +44 (0) 207 457 2020Nick Elwes www.connemaramining.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
27th Sep 20197:00 amRNSInterim Statement for period ended 30 June 2019
17th Sep 20197:00 amRNSNew Gold Target at Inishowen
24th Jul 20192:17 pmRNSResults of Annual General Meeting
24th Jul 20197:00 amRNSSignificant Gold Anomalies at Mine River Project
27th Jun 20197:00 amRNSPosting of Annual Report and Notice of AGM
24th Jun 20197:00 amRNSFinal Results for the Year Ended 31 December 2018
7th May 20191:00 pmRNSNew Mineralisation at Stonepark Zinc Project
1st Apr 20194:14 pmRNSTotal Voting Rights
21st Mar 20194:10 pmRNSChange of Name and Update
12th Mar 20193:24 pmRNSHolding(s) in Company
12th Mar 201912:37 pmRNSResult of EGM
5th Mar 201912:31 pmRNSFundraising of £230,000
12th Feb 20197:00 amRNSProposed Change of Name
24th Jan 20191:00 pmRNSExploration Update at Stonepark Zinc Project
21st Jan 20197:00 amRNSChange of Nominated Adviser and Broker
24th Oct 20181:00 pmRNSFurther Drilling at Stonepark Zinc Project
26th Sep 20187:00 amRNSInterim Report
30th Jul 20187:00 amRNSHolding(s) in Company
25th Jul 20181:32 pmRNSResults of Annual General Meeting
5th Jul 20187:00 amRNSDirector/PDMR shareholding
4th Jul 20187:00 amRNSDrilling Recommences at Oldcastle Zinc Project
29th Jun 20187:00 amRNSPosting of Annual Report and Notice of AGM
25th Jun 201811:23 amRNSMine River Exploration Update
22nd Jun 20187:00 amRNSFinal Results for the Year Ended 31 December 2017
18th Jun 20181:01 pmRNS32.2% Zinc + Lead combined over 5.4m at Stonepark
17th Apr 20182:58 pmRNSMaiden Resource at Stonepark Zinc Project
17th Apr 20187:00 amRNSUK Investor Show 21st April 2018
28th Mar 20187:00 amRNSDrilling Commences at Mine River Gold Project
26th Mar 20187:00 amRNSBusiness Strategic Update
21st Mar 201810:50 amRNSHolding(s) in Company
16th Mar 20182:14 pmRNSInvestor Presentation
15th Mar 20184:23 pmRNSHolding(s) in Company
15th Mar 20189:44 amRNSHolding(s) in Company
9th Mar 20187:00 amRNSDrilling to Commence at the Stonepark Zinc Project
26th Feb 20187:00 amRNSStrategic Financing and Board Restructuring
11th Jan 20187:13 amRNSProspecting Update - Wicklow/Wexford Gold Project
2nd Jan 20182:55 pmRNSHolding(s) in Company
21st Dec 20177:00 amRNSUpdate on Gold Drilling and Field Exploration
16th Nov 20179:52 amRNSGold Drilling to Commence at Mine River
9th Nov 20171:37 pmRNSHolding(s) in Company
9th Nov 20178:52 amRNS14.25g/t gold over 0.5m at Inishowen
27th Oct 20177:00 amRNSDrilling Completed at Inishowen
25th Oct 20172:29 pmRNSHolding(s) in Company
19th Oct 201711:50 amRNSHolding(s) in Company
19th Oct 20177:00 amRNSAcquisition Increases Wicklow Gold Strike Length
17th Oct 201710:14 amRNSReport On Stonepark Zinc Published
13th Oct 201712:16 pmRNSHolding(s) in Company
3rd Oct 20171:29 pmRNSHolding(s) in Company
26th Sep 20177:00 amRNSInterim Statement for the period ended 30 June 17
20th Sep 20179:42 amRNSFurther Drilling to Commence at Inishowen Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.