Q3 Production Report

31 Oct 2006 10:00

Antofagasta PLC31 October 2006 31 October 2006 Antofagasta plc Quarterly Production Report - Q3 2006 Highlights • Group copper production in Q3 was 126,400 tonnes compared with 100,900 tonnes in Q2, reflecting higher production at all three mines. • Molybdenum production at Los Pelambres in Q3 increased to 2,900 tonnes compared with 2,100 tonnes in Q2. • Group cash costs for Q3 fell 12.5 cents to 31.4 cents per pound, mainly due to improved by-product credits. Group Total Q1 Q2 Q3 Q4 Acc Acc Full Year 2006 2006 2006 2006 2006 2005 2005 Total production of 107.0 100.9 126.4 334.3 343.4 467.3payable copper ('000 tonnes) Total production of 2.0 2.1 2.9 7.0 6.7 8.7payable moly ('000 tonnes) Weighted average cash 49.7 43.9 31.4 41.0 4.8 13.9costs (cents per pound) Los Pelambres Los Pelambres produced 88,800 tonnes of payable copper in Q3, an increase of31.5% over the previous quarter. This was mainly due to the release ofunfiltered copper concentrate from the concentrator plant to the port whichbuilt-up in Q2 when repairs to the slurry pipeline took place. The increasedproduction also resulted from higher daily ore throughput at the concentratorplant as Los Pelambres started to benefit from the 140,000 tonnes per dayexpansion project currently in progress, as well as higher recoveries. Thesefactors were partly offset by the effect of the ore grade which as expected waslower this quarter. Molybdenum production in Q3 increased to 2,900 tonnes compared with 2,100 tonnesin Q2. This reflected the higher ore throughput level and changes in the levelof partly-processed molybdenum concentrate and, to a lesser extent, the highermolybdenum ore grade and improved recoveries. Cash costs in Q3 were 5.7 cents per pound, compared with 18.5 cents per pound inQ2. This mainly resulted from improved by-product credits (which increased by9.0 cents) and lower treatment and refining charges (which decreased by 3.5cents). Improved by-product credits resulted mainly from the higher molybdenumproduction and, to a lesser extent, higher molybdenum market prices (whichaveraged US$26.3 per pound compared with US$24.4 per pound in Q2). Onsite andshipping costs for Q3 were marginally below Q2. El Tesoro Cathode production at El Tesoro in Q3 was 25,900 tonnes, an 18.9% increase overthe previous quarter. This was mainly due to higher than expected recoveriesmainly as a result of lower carbonates. Cathode production also benefited fromthe improved ore grade which rose in Q3 in line with budget. Cash costs in Q3 were 76.1 cents per pound, 2.7 cents below the previousquarter. This resulted principally from the higher production level thisquarter. Michilla Michilla produced 11,700 tonnes of copper cathodes in Q3, marginally above Q2.The expected decrease in the ore grade and lower processing level were offset byhigher recoveries. The improved recoveries were due to the higher proportion ofsulphide ores (which yield higher recoveries than oxide ores) processed in theperiod. Cash costs in Q3 were 127.8 cents per pound, 3.9 cents per pound above Q2. Thiswas mainly due to higher transport costs as a result of increased costs of tyresand fuel. Transport Rail tonnages in Q3 were 1,104,000 tons, recovering from the temporary decreaseexperienced the previous quarter. Road tonnages of 361,000 remained in line withprevious quarters. Water The water division continued to perform strongly, with year-to-date volumesincreasing 13.6% over the previous year. Volumes in Q3, usually the weakestseasonal quarter, exceeded the previous two quarters mainly due to increasedsales to the mining sector. Los Pelambres Q1 Q2 Q3 Q4 Acc Acc Full Year 2006 2006 2006 2006 2006 2005 2005 Production statistics Daily average ore treated 120.9 119.5 130.0 123.5 128.3 128.1('000 tonnes) Average ore grade 0.81 0.84 0.78 0.81 0.79 0.80(%) Average recovery 88.1 88.2 89.3 88.6 89.8 89.2(%) Concentrate produced 194.8 200.2 207.4 602.4 645.4 865.1('000 tonnes) Average concentrate grade 39.6 40.0 40.2 40.0 38.4 38.5(%) Fine copper in 76.6 69.8 91.8 238.2 244.0 333.8concentrate('000 tonnes) Payable copper in 74.1 67.5 88.8 230.4 235.9 322.8concentrate('000 tonnes) Average moly ore grade 0.026 0.027 0.028 0.027 0.023 0.022(%) Average moly recovery 74.4 76.0 77.8 76.2 80.0 79.9(%) Payable moly 2.0 2.1 2.9 7.0 6.7 8.7('000 tonnes) Cash costs statistics On-site and shipment 54.5 56.8 56.5 55.9 44.6 47.1costs(cents per pound) Tolling charges for 34.8 45.4 41.9 40.6 27.2 27.6concentrates(cents per pound) By - product credits (59.5) (83.7) (92.7) (79.4) (101.5) (91.8)(cents per pound) * Cash costs 29.8 18.5 5.7 17.2 (29.7) (17.1)(cents per pound) (*) Note: By-products credits do not include any costs attributable to theproduction of molybdenum concentrate. By-product calculations also do not takeinto account unrealised mark-to-market gains at the beginning or end of eachperiod. El Tesoro Q1 Q2 Q3 Q4 Acc Acc Full Year 2006 2006 2006 2006 2006 2005 2005 Daily average ore treated 29.7 28.6 27.9 28.7 26.1 27.2('000 tonnes) Average ore grade 0.99 1.18 1.25 1.14 1.28 1.23(%) Average recovery 77.9 73.9 80.4 77.4 79.7 80.2(%) Copper cathodes 20.8 21.8 25.9 68.4 73.8 98.1('000 tonnes) Cash costs 79.6 79.8 76.1 78.3 63.5 66.1(cents per pound) Michilla Q1 Q2 Q3 Q4 Acc Acc Full Year 2006 2006 2006 2006 2006 2005 2005 Daily average ore treated 14.6 15.4 15.0 15.0 14.9 14.9('000 tonnes) Average ore grade 1.13 1.07 1.03 1.07 1.07 1.10(%) Average recovery 76.2 76.4 80.9 77.8 75.5 75.4(%) Copper cathodes 12.1 11.6 11.7 35.4 33.7 46.4('000 tonnes) Cash costs 120.2 123.9 127.8 123.9 117.3 118.8(cents per pound) Transport Q1 Q2 Q3 Q4 Acc Acc Full Year 2006 2006 2006 2006 2006 2005 2005 Rail tonnage transported 1,122 1,011 1,104 3,237 3,301 4,336('000 tons) Road tonnage transported 383 367 361 1,111 1,122 1,522('000 tons) Water Q1 Q2 Q3 Q4 Acc Acc Full Year 2006 2006 2006 2006 2006 2005 2005 Water volume sold - 9,304 9,231 9,328 27,864 24,526 33,074potable and untreated('000 m3) ** (**) Note: Water volumes include water transportation of 270,000 m3 in Q1,740,000 m3 in Q2 and 254,000 m3 in Q3. For further enquiries: Alejandro Riveraarivera@aminerals.cl Santiago: (56-2) 377 5145 Desmond O'Conordoconor@antofagasta.co.uk London: (44) 20 7808 0988 Hussein Barma London: (44) 20 7808 0988hbarma@antofagasta.co.uk Issued by: Keith Irons, Bankside Consultants (44) 20 7367 8873keith@bankside.com Oliver Winters, Bankside Consultants (44) 20 7367 8874oliver.winters@bankside.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
7th May 20266:27 pmRNSRESULTS OF 2026 ANNUAL GENERAL MEETING
7th May 202610:15 amRNSChairman's Comments at 2026 Annual General Meeting
5th May 20265:00 pmRNSDirector Declaration - External Appointment
24th Apr 20263:00 pmRNSFINAL DIVIDEND PAYABLE
15th Apr 20267:00 amRNSQ1 2026 Production Report
1st Apr 202611:30 amRNSNOTIFICATION OF TRANSACTIONS
26th Mar 20267:00 amRNSPublication of Annual Report and Notice of AGM
17th Feb 20267:00 amRNSFY Results For The Year Ended 31 December 2025
5th Feb 20267:00 amRNS2025 FY Results Presentation and Call Details
29th Jan 20267:00 amRNSQ4 2025 Production Report
28th Jan 20263:00 pmRNSBoard Changes
5th Nov 202512:00 pmRNSSite Visit: Centinela Second Concentrator
27th Oct 20258:00 amRNSPUBLICATION OF PROSPECTUS - REPLACEMENT
27th Oct 20257:00 amRNSPUBLICATION OF PROSPECTUS
23rd Oct 20257:00 amRNSQ3 2025 PRODUCTION REPORT
22nd Sep 20252:00 pmRNSTR-1: Notification of major holdings
10th Sep 202512:00 pmRNSINTERIM DIVIDEND PAYABLE
3rd Sep 20253:32 pmRNSANTOFAGASTA PLC ANNOUNCES PRICING OF BOND
14th Aug 20257:00 amRNSHALF YEAR RESULTS FOR THE 6 MONTHS ENDED 30/06/25
13th Aug 20257:00 amRNSCHANGES TO BOARD COMMITTEES
4th Aug 20257:00 amRNSVIDEO CONFERENCE DETAILS: HALF YEAR 2025 RESULTS
16th Jul 20257:00 amRNSQ2 2025 PRODUCTION REPORT
27th Jun 20256:07 pmRNS(Canada extractive) Report on Payment to Govts
27th Jun 20256:00 pmRNSREPORT ON PAYMENTS TO GOVERNMENTS
26th Jun 202512:00 pmRNSAPPOINTMENT OF INDEPENDENT NON-EXECUTIVE DIRECTOR
16th May 202510:00 amRNSZALDÍVAR EIA APPROVAL
8th May 20256:24 pmRNSRESULTS OF 2025 ANNUAL GENERAL MEETING
8th May 20259:00 amRNSCHAIRMAN’S COMMENTS AT THE 2025 AGM
25th Apr 20256:15 pmRNSFINAL DIVIDEND PAYABLE
16th Apr 20257:00 amRNSQ1 2025 PRODUCTION REPORT
2nd Apr 20258:05 amRNSNOTIFICATION OF TRANSACTIONS
27th Mar 20257:00 amRNS2024 ANNUAL REPORT, 2025 NOTICE OF AGM
7th Mar 202510:00 amRNSDIRECTOR CHANGE AND CHANGES TO BOARD COMMITTEES
18th Feb 20257:00 amRNSFULL YEAR RESULTS FOR THE YEAR ENDED 31.12.2024
11th Feb 20257:00 amRNS2024 FY RESULTS PRESENTATION & CONFERENCE DETAILS
16th Jan 20257:00 amRNSQ4 2024 PRODUCTION REPORT
27th Nov 202412:01 pmRNSCHANGE TO BOARD COMMITTEE CHAIR
16th Oct 20247:00 amRNSQ3 2024 PRODUCTION REPORT
12th Sep 20247:00 amRNSDividend Declaration
20th Aug 20247:00 amRNSHALF YEAR RESULTS
14th Aug 20247:00 amRNSAPPOINTMENT TO BOARD COMMITTEE
14th Aug 20247:00 amRNSVIDEO CONFERENCE DETAILS: HALF YEAR 2024 RESULTS
24th Jul 20247:00 amRNSAPPOINTMENT OF CORPORATE BROKER
17th Jul 20247:00 amRNSQ2 2024 PRODUCTION REPORT
4th Jul 20242:30 pmRNSPUBLICATION OF PROSPECTUS
28th Jun 20244:00 pmRNSREPORT ON PAYMENTS TO GOVERNMENTS
5th Jun 20245:02 pmRNSTRANSFER OF CENTINELA WATER SUPPLY INFRASTRUCTURE
8th May 20246:23 pmRNSRESULTS OF 2024 ANNUAL GENERAL MEETING
8th May 202410:05 amRNSCHAIRMAN’S COMMENTS AT THE 2024 AGM
30th Apr 20247:00 amRNSANTOFAGASTA PLC ANNOUNCES PRICING OF BOND

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.