Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAMC.L Regulatory News (AMC)

  • There is currently no data for AMC

Positive Second Set of Drill Results

9 Sep 2015 07:00

RNS Number : 4627Y
Amur Minerals Corporation
09 September 2015
 

 

9 September 2015

 

AMUR MINERALS CORPORATION

(AIM: AMC)

 

Flangovy Update

Positive Second Set of Drill Results

 

Amur Minerals Corporation ("Amur" or the "Company"), a nickel-copper sulphide mineral exploration and resource development company focused on the far east of Russia, is pleased to announce the second set of drill results from its 2015 Flangovy Drill Programme.

 

A confirmation drill hole indicates that the step out discovery hole reported in as per the announcement on 3 September 2015 has extended the Flangovy resource up to 400 metres adding substantially to the resource potential of the Maly Kurumkon / Flangovy deposit. The infill drill efforts have resumed testing a block of Inferred resource having a length of approximately 250 metres and results from the two of four holes confirm the continuity of the mineralisation between the more widely spaced existing holes. The remaining two holes are presently under analysis and are likely mineralised based on the abundance of visible sulphide mineral associated with the nickel and copper mineralisation. The increased drill density will likely allow for the conversion of Inferred resources to that of Indicated resources for this resource block.

 

As detailed in the announcement dated 3 September 2015, the first step out hole (C306) at Flangovy intersected 46.6 metres of 0.8% nickel and 0.2% copper. A second hole (C305) was drilled approximately 80 metres to the northeast of C306 to confirm the orientation of the peridotite host zone as well as the nickel and copper content. Hole C305 was drilled to a total depth of 388 metres and intersected the ore bearing peridotite sill at a depth of 355 metres confirming the orientation and presence of the host zone. The sill dips at 30 degrees to the northeast and contains an average nickel grade of 0.7% and copper of 0.2%. Mineralisation is contained within two layers having a total thickness of 11.3 metres. Though the thickness of the mineralisation is substantially less than that of C306 (46.6 metres), the potential of the zone was not fully tested. Only 35 metres of the anticipated 60 metre sill target were drilled. This was due to a mechanical failure precluded completion of the hole. Whilst under repair, the hole was lost due to permafrost induced freezing of the drill fluids forcing abandonment of the hole.

 

Resumption of the infill programme has confirmed the continuity of the mineralised structure and grade over a 250 metre long area located between two historical drill sections at the east end of Flangovy. The four holes are located along two intermediate drill sections and all have intersected the peridotite sill with significant sulphide mineralisation being present. Analyses for two of the four holes indicate that the average mineralised thickness per hole is 34.1 metres containing 0.8% nickel and 0.2% copper. The nearest historical drill holes contain an average total thickness of 27.0 metres with the nickel content being 0.87% nickel and 0.24% copper. These highly correlative results indicate that the conversion of Inferred resource to that of Indicated is highly likely.

 

Highlights:

 

· A verification hole was drilled 80 metres from the exploratory step out hole located 400 metres to the east of the last ore intercepts at Flangovy. The existence of the peridotite ore bearing zone was confirmed and has been determined to be similar in structure and orientation to that of Flangovy providing additional evidence that Flangovy is substantially larger than originally defined. It is now interpreted to be at least 1,250 metres in length. This is an increase of 40% in the total mineralised length of this area.

 

· The full potential of the extension is not yet determined. The loss of the confirmation hole before fully penetrating the ore bearing peridotite sill has resulted in the Company not testing the full potential of the zone. Only 35 metres of the anticipated 60 metres were tested.

 

· Infill drilling has been resumed and is being implemented on an east to west basis. The first block to be tested contains approximately 8.0 million tonnes of Inferred resource and requires four holes to test the continuity of the structure and grade of the mineralisation.

 

· Four holes have been completed within the block, all of which have intersected the ore bearing sill and substantial thicknesses of sulphide mineralisation have been identified. The sulphide mineralisation contains the nickel and copper.

 

· Two of the four holes have been analysed using the Niton XL2 500 X-Ray Fluorescence units on site and the average total mineralisation intersected by the two holes is 31.4 metres with 0.8% nickel and 0.2% copper. The two nearby historical holes contained an average of 27.0 metres of total mineralisation at 0.86% nickel and 0.24% copper as per Alex Stewart Laboratory results.

 

· Continued verification of historical results provides substantial potential to convert the current Inferred resource to that of Indicated which allows for the inclusion in the reserve inventory.

 

· Drill rates to date indicate that approximately 5,500 to 5,700 metres will be completed by the end of this season barring a prolonged breakdown of the rig or an early winter setting in. This drill meterage should allow for conversion of the majority of the 30 million tonne Inferred resource to that of Indicated provided drill results continue to confirm existing historical results.

 

· RFA results are available for 1,573.4 total metres of the drilled core and results will be released in due course.

 

The design of the drill programme and various key considerations in evaluation of the information are presented in the "Notes to Editor" below.

 

Robin Young, CEO of Amur Minerals, commented:

 

"Confirmation that the Flangovy deposit is likely to be at least 400 metres longer should add substantially to the resource inventory of Kun-Manie. With the infill programme underway and results confirming our original drill results, we also look forward to a reclassification of the resource at Flangovy. Here we anticipate a substantial upgrade in our Indicated resource class which means these can potentially be fully converted into reserves suitable for a Definitive Feasibility Study. This anticipated upgrade, we believe, removes risk and provides for a more flexible mine plan going forward."

 

 

 

Company

Amur Minerals Corp.

Nomad and Broker

S.P. Angel Corporate Finance LLP

Public Relations

Yellow Jersey

 

Robin Young CEO

 

Ewan Leggat

Katy Birkin

 

Dominic Barretto

Harriet Jackson

 

+44 (0) 7981 126 818

+44 (0) 20 3470 0470

+44 (0) 7768 537 739

 

For additional information, visit the Company's website, www.amurminerals.com.

 

Notes to Editor

 

The information contained in this announcement has been reviewed and approved by the CEO of Amur, Robin Young. Mr. Young is a Geological Engineer (cum laude) and is a Qualified Professional Geologist, as defined by the Toronto and Vancouver Stock Exchanges.

 

Drill Results Report

The 2015 drill results are provided in the table below. The attached link presents a schematic of the Maly Kurumkon / Flangovy deposit.

http://www.rns-pdf.londonstockexchange.com/rns/4627Y_-2015-9-8.pdf

 

Flangovy Drill Core Results

 

RFA Results

Diamond Core Hole Results

0.2% Ni Cut Off Grade

Comments and Impact

Hole #

Depth

(m)

From

(m)

To

(m)

Length (m)

Ni

(%)

Cu

(%)

C300

150.0

121.0

122.5

1.5

0.2

0.0

Down Dip Mineral Limit Established

C301

31.0

Barren

Barren

Hidden Outcrop Limit Established

C302

229.6

143.8

185.5

206.3

161.5

203.5

218.6

17.7

18.0

12.1

0.7

0.9

0.8

0.3

0.2

0.2

Block 1 (Section A and B Area)

Thickness and Grade Confirmed

Resource Upgrade Potential

C305

388.0

359.2

374.5

366.0

379.0

6.8

4.5

0.8

0.7

0.2

0.2

Step Out Verification Hole

Extension of Flangovy

Additional Deeper Potential Exists

C306

374.8

316.0

329.6

356.5

328.7

346.0

374.0

12.7

16.4

17.5

1.0

0.7

0.7

0.2

0.2

0.3

Step Out

Extends Flangovy 400 metres to East

C308

400.0

358.0

374.5

365.5

382.0

7.5

7.5

0.7

0.7

0.2

0.2

Block 1 (Section A and B Area)

Thickness and Grade Confirmed

Resource Upgrade Potential

Total

1,573.4

Awaiting ASL results.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFERATITIIE
Date   Source Headline
16th Sep 20197:00 amRNSTEO Reserve Estimation Programme Initiated
2nd Sep 20199:16 amRNSConversion of Loan and Issue of Equity
27th Aug 20197:36 amRNSIssue of Equity
7th Aug 20197:00 amRNSBoard Appointment
1st Aug 20198:57 amRNSConversion of Loan and Issue of Equity
10th Jul 20199:11 amRNSConversion of Loan and Issue of Equity
3rd Jul 201912:02 pmRNSPrice Monitoring Extension
25th Jun 20197:00 amRNSAUDITED FINAL RESULTS FOR THE YEAR
19th Jun 201910:48 amRNSConversion of Loan and Issue of Equity
4th Jun 20198:39 amRNSConversion of Loan and Issue of Equity
22nd Mar 201910:43 amRNSReplacement - Loan restructuring & further advance
22nd Mar 20197:00 amRNSLoan restructuring and further advance
20th Mar 20191:45 pmRNSDirectors Dealing
1st Mar 20191:37 pmRNSPFS Executive Summary
27th Feb 20198:58 amRNSConversion of Loan and Issue of Equity
26th Feb 20197:00 amRNSKun-Manie Pre-Feasibility Study
22nd Feb 20199:42 amRNSAccess Road Capital Cost Update
21st Feb 20199:47 amRNSDirectors Dealing
6th Feb 20197:00 amRNS2018 Alex Stewart Laboratory Final Results
22nd Jan 201912:01 pmRNSDirectors Dealing
2nd Jan 201910:20 amRNSConversion of Loan and Issue of Equity
24th Dec 201810:12 amRNSConversion of Loan and Issue of Equity
21st Dec 20189:06 amRNSDirectors Dealing
13th Dec 201810:15 amRNSAnnual General Meeting Results
28th Nov 201812:26 pmRNSNotice of Annual General Meeting
28th Nov 201810:54 amRNSConversion of Loan and Issue of Equity
20th Nov 201810:28 amRNSDirectors Dealing
19th Nov 20183:05 pmRNSInvestor Event
19th Nov 20187:00 amRNSStrategic Plan
12th Nov 20187:00 amRNSUpdate on PFS
5th Nov 20187:00 amRNSAmur Completes 2018 Drill Programme
22nd Oct 201811:19 amRNSDirectors Dealing
28th Sep 20187:00 amRNSInterim Results 2018
20th Sep 201811:45 amRNSDirectors Dealing
19th Sep 201811:16 amRNSConversion of Loan and Issue of Equity
19th Sep 20187:00 amRNSAugust 2018 Drill Programme Milestones
10th Sep 20185:13 pmRNSConversion of Loan and Issue of Equity
30th Aug 20189:30 amRNSConversion of Loan and Issue of Equity
23rd Aug 20189:20 amRNSConversion of Loan and Issue of Equity
20th Aug 20186:07 pmRNSDirectors Dealing
16th Aug 20187:00 amRNSJuly 2018 Drill Programme Milestones
30th Jul 20189:00 amRNSConversion of Loan and Issue of Equity
25th Jul 20189:40 amRNSConversion of Loan and Issue of Equity
23rd Jul 20187:00 amRNSGEFCO MEMORANDUM OF COOPERATION
20th Jul 201812:20 pmRNSDirectors Dealing
10th Jul 20189:45 amRNSConversion of Loan and Issue of Equity
5th Jul 20187:00 amRNSDrill Programme Update
28th Jun 20184:40 pmRNSSecond Price Monitoring Extn
28th Jun 20184:35 pmRNSPrice Monitoring Extension
28th Jun 20187:00 amRNSMining Potential Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.