If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAMC.L Regulatory News (AMC)

  • There is currently no data for AMC

Hydrological Assessment Complete

12 Nov 2019 07:00

RNS Number : 0329T
Amur Minerals Corporation
12 November 2019
 

 

 

12 November 2019

 

AMUR MINERALS CORPORATION

(AIM: AMC)

 

Hydrological Assessment Complete

 

Amur Minerals Corporation ("Amur" or the "Company"), the nickel-copper sulphide exploration and development company focused on the far east of Russia, is pleased to announce that the Hydrological Assessment (a component of the Company's Permanent Conditions TEO ("TEO")) for its Kun-Manie nickel copper sulphide project is now complete and has been approved by the necessary Russian Federation agencies.

 

The Hydrological Assessment has confirmed the presence of substantial groundwater reserves located along the Maly Kurumkon and Bolshoy Kurumkon water sheds (referred to as the Ataga underground water deposit) sufficient to support the Kun-Manie proposed mining operation. The assessment confirms both potable/ablution water and process water supplies are available for the mining and ore processing of six million tonnes of ore per annum. The assessment has been reviewed and approved by the State Expert Commission on Reserves (TKZ Amurnedra) and Khabarovsk Branch of the State Committee on Reserves (GKZ for the Far East regions).

 

Hydrological Assessment highlights:

 

·; The hydrological assessment has been completed in accordance with Russian regulatory procedures.

 

·; The work programme has identified two geographically separated water sources. One each for potable/ablution water and industrial usage inventories. Water reserves are projected to cover a minimum project life of 25 years.

 

·; The results confirm that 700 cubic metres per day of potable/ablution water is available to support the anticipated site crew of about 500 personnel. The source of the potable/ablution water is located well upstream (approximately three kilometers, the recommended protection boundary) from the proposed plant site.

 

·; During operations, the potable and ablution waters will be drawn from two wells (one acting as a backup well) and sourced from subsurface waters identified along the Maly Kurumkon water course. The water quality meets the Russian Federation SanPin2.1.4.1074-01 standards and technogenic compounds (oil products, phenols, pesticides, cyanides, etc.) are absent from the source area (below the limits of detection). It is recommended that the potable/ablution waters are pretreated by low cost simple sedimentation and filtering prior to use. During sinter operations when the subsurface waters will not be recharged through surface runoff, water levels will be lowered by approximately 1.5 metres and subsequently are projected to be fully recharged during the spring snow melt and summer rains.

 

·; Subsurface industrial water in the amount of 7,000 cubic metres per day of makeup water is required and has been identified along the Bolshoy Kurumkon water course adjacent the planned process plant site. Sourcing of the industrial water will require an eight hole field (including one backup hole) with the holes being spaced at 450 metres intervals along the water course. The initial startup water charge, approximately 50,000 cubic metres, is anticipated to be initially sourced through a combination from the nearby Maya River and the well field. This field is to be located downstream from the potable/ablution water source. During winter operations, depression of the subsurface water level is projected to be in the order of 38 metres with full recharge occurring during the spring snow melts and summer rains.

 

·; Based on the Company's completed work, independent hydrological consultant assessments and expert reviews by Russian authorities, it is stated that existing reserves fully satisfy the declared demand for water usage.

 

The key findings of the Hydrological Assessment report will be incorporated into the ensuing western Feasibility Study ("FS") work.

 

For further information on the content of the TEO, please follow the links below:

 

https://amurminerals.com/content/wp-content/uploads/TEO-Overview-Sept-2019.pdf

https://amurminerals.com/content/wp-content/uploads/20190923-TEO-DFS-Work-Programme.pdf 

 

Robin Young, CEO of Amur Minerals Corporation, commented:

 

"Results from the Hydrological Assessment have established that a more than sufficient water supply is available to fully support the annual six million tonne of ore operation at our Kun-Manie nickel copper sulphide operation. Comprised of two categories of water which are potable/ablution waters to support a 500 staff operation and industrial usage to crush, grind and float the sulphide metals from the ores allowing for the generation of concentrates, these waters can be derived from a limited number of holes, ten in total. This indicates that a relatively small cost will be required to develop the necessary two well fields.

 

"With the potable/ablution and industrial waters being sourced from two separate locations, we can be assured that the hydrological programme identified by the assessment maintains the integrity and quality of the critical potable/ablution source."

 

Market Abuse Regulation (MAR) Disclosure

 

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

 

Enquiries:

 

Company

Amur Minerals Corp.

Nomad and Broker

S.P. Angel Corporate Finance LLP

Public Relations

Blytheweigh

Robin Young CEO

Richard Morrison

Soltan Tagiev

Megan Ray

Tim Blythe

+7(4212)755615

+44(0)20 3470 0470

+44 (0) 20 7138 3203

 

Notes to Editors

 

The information contained in this announcement has been reviewed and approved by the CEO of Amur, Mr. Robin Young. Mr. Young is a Geological Engineer (cum laude), a Professional Geologist licensed by the Utah Division of Occupational and Professional Licensing, and is a Qualified Professional Geologist, as defined by the Toronto and Vancouver Stock Exchanges and a qualified person as defined by the AIM Rules for Companies. An employee of Amur for 15 years, previously Mr. Young was employed as an independent consultant with Fluor Engineers, Fluor Australia and Western Services Engineering, Inc. during which time his responsibilities included the independent compilation of resources and reserves in accordance with JORC standards. In addition, he was the lead engineer and participant of numerous studies and projects requiring the compilation of independent Bankable Studies utilised to finance small to large scale projects located worldwide. Mr. Young is responsible for the content of this announcement.

 

For further information, and Company updates see the Company website at www.amurminerals.com and twitter page @amur_minerals.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCBBBRTMBTBBFL
Date   Source Headline
1st Sep 20102:00 pmRNSKun-Manie Exploration Rights Extended
23rd Jul 201010:00 amRNSPlacing completed
7th Jul 20107:00 amRNSApplic for Extension K-M Exploration Licence Filed
30th Jun 20107:00 amRNSFinal Results
18th Jun 20108:30 amRNSKun-Manie licence update
14th Jun 20107:00 amRNSPotential Expansion of Kun-Manie - Ikenskoe Depos)
29th Apr 20107:00 amRNSGorney, A New Kun-Manie Drill Target Confirmed
23rd Apr 201011:45 amRNSBoard Change
31st Mar 201010:00 amRNSResult of General Meeting
22nd Mar 20108:00 amRNSReconvening of General Meeting
5th Mar 20107:00 amRNSShareholder Update
22nd Feb 20105:21 pmRNSAnnouncement re General Meeting
1st Feb 20102:00 pmRNSNotice of EGM
19th Oct 20097:00 amRNSReserve Estimate for Maly Krumkon Approved
16th Sep 20097:00 amRNSBoard Additions
15th Sep 20099:00 amRNSResult of AGM
10th Sep 20092:23 pmRNSShare Issuance
9th Sep 200910:00 amRNSInterim Results
28th Aug 20094:23 pmRNSPlacing
27th Aug 200911:34 amRNSHoldings in Company
21st Aug 20091:34 pmRNSPlacing
20th Aug 20097:00 amRNSReserve Update - US$6.9bn Value
12th Aug 20095:00 pmRNSAnnual General Meeting Date and Venue Change
30th Jun 20094:30 pmRNSFinal Results
8th Jun 20097:00 amRNSIssue of Equity
5th Jun 20098:00 amRNSAdmission Delay
1st Jun 20095:14 pmRNSShare Exchange and Placing
8th May 20097:00 amRNSGovernmental Approvals For Further Exploration At
30th Apr 200911:13 amRNSCorrection - Placing to Raise ?180,000
30th Apr 20097:00 amRNSPlacing
23rd Apr 20094:24 pmRNSRussian Government Certifies Kun-Manie Discovery
13th Feb 20091:23 pmRNSHolding(s) in Company
22nd Jan 20099:30 amRNSChange of Adviser
29th Dec 200810:15 amRNSResignation of Directors
22nd Dec 20081:30 pmRNSEGM Statement
18th Dec 20087:00 amRNSLicence Extension
1st Dec 200812:45 pmRNSProposed De-Listing from AIM
21st Oct 200810:00 amRNSResult of Shareholders' Meeting
29th Sep 20087:00 amRNSInterim Results
23rd Sep 20087:00 amRNSHolding(s) in Company
30th Jul 20087:00 amRNSDrilling Intersects High Grad
2nd Jul 200810:00 amRNSPlacing
19th May 20083:24 pmRNSResult of AGM
29th Apr 20087:30 amRNSTrading on PLUS Markets
28th Apr 20087:00 amRNSInitial Permitting Completed
31st Mar 200812:00 pmRNSFinal Results
5th Mar 20084:00 pmRNSAppointment of Director
5th Mar 20083:45 pmRNSResult of Meeting
14th Feb 20087:01 amRNSPlacing and EGM Notice
13th Dec 20077:00 amRNSKun-Manie Pre-Feasibility

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.