Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmur Minerals Regulatory News (AMC)

  • This share is currently suspended. It was suspended at a price of 0.09

Share Price Information for Amur Minerals (AMC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.09
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.09
AMC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

2017 Ice Road Resupply Completed

10 Apr 2017 07:00

RNS Number : 9915B
Amur Minerals Corporation
10 April 2017
 

 

10 April 2017

 

AMUR MINERALS CORPORATION

(AIM: AMC)

 

2017 Ice Road Resupply Completed

 

Amur Minerals Corporation ("Amur" or the "Company"), a nickel-copper sulphide mineral exploration and resource development company, is pleased to announce that the Company has completed the full restock and mobilisation of all newly purchased machinery, spares and supplies for completion of its 2017 field season on its Kun-Manie nickel copper sulphide project located in the Far East, Russia.

 

Highlights:

 

· The largest total resupply effort ever undertaken on the project commenced on 18 February and was completed on 7 April. Early initiation of the 350-kilometre-long Ice Road construction allowed nine convoys to successfully and completely position the Company for a full implementation of the 2017 field programme.

 

· The newly purchased capital items, including a Caterpillar D6RII dozer, Caterpillar 320D2L excavator, water well drill rig, truck mounted crane, personnel carrier, fuel truck, drop-side truck and portable man cabins have been mobilised to site during the Ice Road period.

 

· Over 400 tonnes of summer and winter fuel have been delivered. This is a significant increase over last year and enhances the Company's ability to expand its operations at the Kun-Manie deposit and its adjacent water exploration licence where it is anticipated that the mill will be constructed.

 

· A comprehensive restock of drill supplies, spare parts, and food stuffs is now complete and the site is in the final stages of preparation for full summer field crew component of nearly 90 individuals. Field operations are anticipated to begin by end of May.

 

· Mineral exploration drilling of 15,000 to 20,000 metres can now be completed which will include infill, step out and resource expansion.

 

· The newly acquired water well drill rig will be used to define subsurface water for use in the processing of 6.0 million tonnes of ore per annum and to define a potable water supply capable of supporting a 1,000 man camp required for operation of the proposed mine configuration. The water well rig will also drill a series of holes near the Maly Kurumkon / Flangovy ore body to determine the extent of any required water diversion requirements and dewatering needs from the anticipated open pit(s) and underground mining operation.

 

Logistical summary

 

The successful delivery of a record tonnage of materials to site and the newly acquired equipment ensures the Company's ability to continually advance the Kun-Manie project to a design, construction decision and DFS compilation.

 

The Ice Road mobilisation effort was completed by a series of nine convoys manned by a 35 to 40 team of staff during which over 500 tonnes of supplies and equipment were delivered to Kun-Manie site over a 30-day period. The last half for the Ice Road use period was complicated due to rapidly and unseasonably warming temperatures in the area. The convoy staff is now in place on site and represents a key component to supporting our operations during the field season. Their activities have now shifted to preparing our camp facilities for arrival of the remainder of the team beginning in late April.

 

A total of 35 tonnes of drill rods, bits, spares and additives have been delivered to the site to support Company-owned LF-90 and LF-70 Boart Longyear rigs allowing us to target over 15,000 metres of diamond core drilling. Additional new and more highly powered water pumps, a pneumatic compressor and Thermex WaterLine heaters will ensure that a continuous water supply can be maintained in low temperatures and steep terrain environments. Two additional portable six-man housing units have been sourced, allowing for the housing of drill crews nearer each of the drill rigs and increasing their mobility with the Kun-Manie water exploration licences.

 

The additional Caterpillar ("CAT") equipment expands Amur's earth moving fleet allowing for additional operational field objectives to be completed with regard to drill road and drill pad construction, as well as engineering work directly related to the development of the project. The onsite dozer fleet now stands at six. Use of the CAT 320D2L excavator during last year's field season provided a substantial increase in our ability to rapidly build roads and drill pads in the increasingly challenging terrain and permafrost areas less suitable for dozer work. For this reason, a second 320D2L excavator equipped with a hydraulic hammer was purchased allowing for an expansion of our abilities to rapidly construct access roads and drill pads in the remaining drill areas characterised by increasingly rugged terrain.

 

Additional equipment purchases transported to the site include a 25-tonne mobile crane, a Ural drop-side truck, a ten cubic metres fuel truck and a Ural personnel carrier with the capacity to carry up to 28 passengers. Associated spares for the existing and newly delivered fleet totalling 40 tonnes are now available on site.

 

Greatly expanded earth moving and drilling capacity over the last two years has resulted in increased fuel demand during the field season operations. This year the Company doubled its summer fuel restock compared to 2016 to ensure consistent machinery and equipment performance at various targets at the Kun-Manie project area. In addition, a total of 35 tonnes of aviation fuel for the helicopter support required during the summer field season, gasoline, oils and lubricants have been delivered during the Ice Road resupply period.

 

Food and field supplies for the staff anticipated to average 90 permanent and seasonal contract employees are on site. Approximately 20 tonnes are presently available and will be refreshed with each scheduled helicopter flight over the course of the field season.

 

Robin Young, CEO of Amur Minerals, commented:

 

"The success of any field season is based on our ability to fully restock the Kun-Manie project site over the Ice Road. As we move from drilling to engineering related activities, we continue to shift our focus toward establishing key considerations related to the development of information required for inclusion in a Definitive Feasibility Study. This includes activities such as the compilation of specific hydrological studies related to processing, mining and support of a fully maned operation once it is in production.

 

"The drilling is also an integral part of the process of setting up for a production decision. By infill work, we are able to define reserves for production planning and scheduling and the subsequent use in finalising Russian required approvals for operational site activities and laying the ground work for the determination of funding requirements and any specific terms and conditions to facilitate the establishment of a viable mine that is also immune to the impact of variable commodity prices.

 

"We look forward to initiation of our field operations and the issuance of our drill updates and associated site activities."

 

 

Company

Amur Minerals Corp.

Nomad and Broker

S.P. Angel Corporate Finance LLP

Public Relations

Yellow Jersey

Robin Young CEO

Ewan Leggat

Soltan Tagiev

Dominic Barretto

Charles Goodwin

+74212755615

+44(0)2034700470

+44(0)7747788221

 

For additional information, visit the Company's website, www.amurminerals.com.

 

Notes to Editors

 

The information contained in this announcement has been reviewed and approved by the CEO of Amur, Mr. Robin Young. Mr. Young is a Geological Engineer (cum laude), a Professional Geologist licensed by the Utah Division of Occupational and Professional Licensing, and is a Qualified Professional Geologist, as defined by the Toronto and Vancouver Stock Exchanges. An employee of Amur for 12 years, previously Mr. Young was employed as an exploration and mine geologist, mining engineer, construction manager of a mine start up as well as independent consultant with Fluor Engineers, Fluor Australia and Western Services Engineering, Inc. during which time his responsibilities included the independent compilation of resources and reserves in accordance with JORC standards. In addition, he has been the lead engineer and project manager in the compilation of numerous studies and projects requiring the compilation of independent Bankable Studies utilised to finance small to large scale projects located worldwide. Mr. Young is responsible for the content of this announcement which includes information derived by SRK.

 

For further information, see the Company website at www.amurminerals.com.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCIRMTTMBAMTLR
Date   Source Headline
10th Jul 20199:11 amRNSConversion of Loan and Issue of Equity
3rd Jul 201912:02 pmRNSPrice Monitoring Extension
25th Jun 20197:00 amRNSAUDITED FINAL RESULTS FOR THE YEAR
19th Jun 201910:48 amRNSConversion of Loan and Issue of Equity
4th Jun 20198:39 amRNSConversion of Loan and Issue of Equity
22nd Mar 201910:43 amRNSReplacement - Loan restructuring & further advance
22nd Mar 20197:00 amRNSLoan restructuring and further advance
20th Mar 20191:45 pmRNSDirectors Dealing
1st Mar 20191:37 pmRNSPFS Executive Summary
27th Feb 20198:58 amRNSConversion of Loan and Issue of Equity
26th Feb 20197:00 amRNSKun-Manie Pre-Feasibility Study
22nd Feb 20199:42 amRNSAccess Road Capital Cost Update
21st Feb 20199:47 amRNSDirectors Dealing
6th Feb 20197:00 amRNS2018 Alex Stewart Laboratory Final Results
22nd Jan 201912:01 pmRNSDirectors Dealing
2nd Jan 201910:20 amRNSConversion of Loan and Issue of Equity
24th Dec 201810:12 amRNSConversion of Loan and Issue of Equity
21st Dec 20189:06 amRNSDirectors Dealing
13th Dec 201810:15 amRNSAnnual General Meeting Results
28th Nov 201812:26 pmRNSNotice of Annual General Meeting
28th Nov 201810:54 amRNSConversion of Loan and Issue of Equity
20th Nov 201810:28 amRNSDirectors Dealing
19th Nov 20183:05 pmRNSInvestor Event
19th Nov 20187:00 amRNSStrategic Plan
12th Nov 20187:00 amRNSUpdate on PFS
5th Nov 20187:00 amRNSAmur Completes 2018 Drill Programme
22nd Oct 201811:19 amRNSDirectors Dealing
28th Sep 20187:00 amRNSInterim Results 2018
20th Sep 201811:45 amRNSDirectors Dealing
19th Sep 201811:16 amRNSConversion of Loan and Issue of Equity
19th Sep 20187:00 amRNSAugust 2018 Drill Programme Milestones
10th Sep 20185:13 pmRNSConversion of Loan and Issue of Equity
30th Aug 20189:30 amRNSConversion of Loan and Issue of Equity
23rd Aug 20189:20 amRNSConversion of Loan and Issue of Equity
20th Aug 20186:07 pmRNSDirectors Dealing
16th Aug 20187:00 amRNSJuly 2018 Drill Programme Milestones
30th Jul 20189:00 amRNSConversion of Loan and Issue of Equity
25th Jul 20189:40 amRNSConversion of Loan and Issue of Equity
23rd Jul 20187:00 amRNSGEFCO MEMORANDUM OF COOPERATION
20th Jul 201812:20 pmRNSDirectors Dealing
10th Jul 20189:45 amRNSConversion of Loan and Issue of Equity
5th Jul 20187:00 amRNSDrill Programme Update
28th Jun 20184:40 pmRNSSecond Price Monitoring Extn
28th Jun 20184:35 pmRNSPrice Monitoring Extension
28th Jun 20187:00 amRNSMining Potential Update
27th Jun 20181:40 pmRNSFinal Results for the Year Ended 31 December 2017
22nd Jun 20184:35 pmRNSPrice Monitoring Extension
21st Jun 201811:19 amRNSDirectors Dealing
20th Jun 20188:22 amRNSConversion of Loan & Issue of Equity
13th Jun 20187:00 amRNSMay 2018 Drill Programme Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.