Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmara Mining Regulatory News (AMA)

  • There is currently no data for AMA

Update on Baomahun Project

22 Jun 2005 07:00

Cluff Gold PLC22 June 2005 22 June 2005 AIM: CLF CLUFF GOLD PLC Baomahun Update Cluff Gold Plc ("Cluff Gold" or "the Company") today announces drilling resultsfrom the Baomahun Gold Prospect ("Baomahun") in Sierra Leone. Baomahun islocated about 180 km east of the capital, Freetown, in the Southern Province ofthe country. Recent soil sampling has identified 5 zones of anomalous goldmineralisation with a combined strike length of 3.4 km. To date ten core holes, programmed to confirm previous exploration drillingresults and determine additional possible strike extensions to knownmineralisation, have been completed on the Eastern Zone, one of three structureswhich have been mined in the past. Below is a table of some of the significantintersections. Hole ID Dip (degrees) Intercept From (m) DDH01 45 30m@4.68g/t 106 Includes 13m@9.57g/tDDH02 45 20m@2.72g/t 75 Includes 8m@5.67g/t DDH03 45 21.5m@0.5g/t 97.5 16.2m@4.02g/t Includes 5m@9.02g/tDDH04 45 and 10m@1.82g/t 25.8 and 137 DDH05 45 4.1m@4.92g/t 168.9DDH06 45 14m@1.06g/t 59DDH07 45 25m@6.33g/t 150 Includes 4m@20.65g/tDDH08 45 6.3m@2.13g/t 67.5 The Eastern Zone is still open along strike to the north and down dip. The Company expects to make further announcements upon the completion ofdrilling of the Central and Western Zones, following which a drill report and aresource update will be published. The report will also incorporate sometwenty-nine core holes which were drilled in the past. The drill programme is behind schedule as a result of mechanical break downsexperienced by the drilling contractor. The Company is in the process ofmobilising a second drill rig from neighbouring Guinea to expedite the drillingprogramme. A drilling contract has been signed with Boart Longyear Inc aftermonths of waiting for rig availability. Douglas Chikohora, Technical Director of Cluff Gold plc, comments, '"We areencouraged by the assay results from this part of the Eastern Zone. The drilledportion represents less than 10% of the known gold in soil anomaly at Baomahunand 80% of the holes drilled to date have intersected significantmineralisation. While we would prefer to have been further advanced in thedrilling programme, we are pleased that the second drill rig will be onsite andoperating as soon as possible." Cluff has a right to earn a 60% interest in Baomahun by funding the project tothe completion of a bankable feasibility study or to a maximum of US$5 million.This right is to be acquired from Winston Mines which owns the two explorationlicences relating to Baomahun covering an area of approximately 137 km(2). For further information, please contact: Cluff Gold Numis Securities Parkgreen CommunicationsJ.G. Cluff / Douglas Chikohora John Harrison Cathy Malins / Annabel LeatherChairman / Technical Director Tel: 020 7776 1500 Tel: 020 7493 3713Tel: 020 7340 9790 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
29th Apr 201010:17 amRNSForm 8.5 (EPT/RI)
28th Apr 201010:44 amRNSForm 8.5 (EPT/RI)
27th Apr 20109:52 amRNSForm 8.5 (EPT/RI)
26th Apr 20106:21 pmRNSForm 8.3 - Cluff Gold Plc
26th Apr 20106:20 pmRNSForm 8.3 - Cluff Gold PLC
26th Apr 20106:19 pmRNSForm 8.3 - Cluff Gold Plc
23rd Apr 201010:11 amRNSForm 8.5 (EPT/RI)
22nd Apr 20102:04 pmRNSForm 8.3 - Cluff Gold Plc
22nd Apr 20109:40 amRNSForm 8.5 (EPT/RI)
21st Apr 20101:57 pmBUSForm 8.3 - Cluff Gold PLC
21st Apr 20101:51 pmRNSForm 8.3 - Cluff Gold Plc
21st Apr 201011:16 amRNSForm 8.5 (EPT/RI)
20th Apr 201011:05 amRNSForm 8.3 - Cluff Gold PLC
20th Apr 20108:43 amRNSForm 8.5 (EPT/RI)
19th Apr 201010:32 amRNSForm 8.5 (EPT/RI)
16th Apr 201010:07 amRNSEPT Disclosure
15th Apr 201011:23 amRNSEPT Disclosure
14th Apr 201010:39 amRNSEPT Disclosure
13th Apr 20109:05 amRNSEPT Disclosure
12th Apr 20109:34 amRNSEPT Disclosure
9th Apr 20102:18 pmRNSRule 8.3 - Cluff Gold Plc
9th Apr 20101:23 pmRNSNew mineralised zone at Baomahun Gold Project
9th Apr 20109:50 amRNSEPT Disclosure
8th Apr 201010:27 amRNSEPT Disclosure
7th Apr 201010:27 amRNSEPT Disclosure
6th Apr 20109:04 amRNSEPT Disclosure
1st Apr 20109:44 amRNSEPT Disclosure
1st Apr 20108:24 amRNSAdditional Listing
31st Mar 201011:59 amRNSRule 8.3- Cluff Gold Plc
31st Mar 201010:52 amRNSEPT Disclosure
30th Mar 201012:04 pmRNSRule 8.3- Cluff Gold Plc
30th Mar 20109:49 amRNSEPT Disclosure
29th Mar 201011:02 amRNSRule 8.3- Cluff Gold PLC
29th Mar 201010:49 amRNSEPT Disclosure
26th Mar 20103:09 pmRNSRule 8.3-Cluff Gold Plc
26th Mar 20102:39 pmRNSRule 8.3- Cluff Gold Plc
26th Mar 201011:43 amRNSEPT Disclosure
25th Mar 20109:50 amRNSEPT Disclosure
24th Mar 20103:24 pmRNSRule 8.3- Cluff Gold PLC
24th Mar 20101:04 pmRNSEPT Disclosure - Amendment
24th Mar 201010:11 amRNSEPT Disclosure
23rd Mar 20101:24 pmRNSRule 8.3- Cluff Gold Plc.
23rd Mar 20109:39 amRNSEPT Disclosure
22nd Mar 201011:11 amRNSEPT Disclosure
19th Mar 20109:37 amRNSEPT Disclosure
19th Mar 20107:00 amRNSRecord Gold Production in First Two Months of 2010
18th Mar 201010:02 amRNSEPT Disclosure
17th Mar 20108:55 amRNSEPT Disclosure
16th Mar 20101:40 pmRNSRule 8.3 - Cluff Gold Plc
16th Mar 20107:51 amRNSEPT Disclosure

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.