Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmara Mining Regulatory News (AMA)

  • There is currently no data for AMA

Baomahun Scoping Study

3 Sep 2007 07:01

Cluff Gold PLC03 September 2007 Cluff Gold plc ("Cluff Gold" or the "Company") Scoping study completed for the Baomahun Gold Project, Sierra Leone Cluff Gold today announces the completion of a scoping study (''the ScopingStudy'') on the Baomahun Gold Project ("Baomahun" or "the Project") in SierraLeone. The Scoping Study was developed in conjunction with independent consultants RSGGlobal Consulting and SENET Engineering. The result of the study shows that there is an economically recoverable zone ofmineralisation that could be successfully exploited by an open pit miningoperation with a conventional Carbon in Leach (CIL) ore beneficiation andrecovery process of approximately 1.0 to 1.5Mtpa. The Project could produceapproximately 140 000 to 200 000 ounces annually and the metallurgical test workdone to date has confirmed the ore to be non- refractory. The Scoping Study is based on the current Indicated and Inferred Resources of1.16 million ounces as announced by the company on 4 July. Less than 25% of theprospective trend has been drilled so far. Mr. Douglas Chikohora, Technical Director of Cluff Gold comments, "We aredelighted with the on-schedule completion of this Scoping Study which, as wellas being very positive in its findings, also fully addresses the issues ofinfrastructure including power supply for Baomahun. As we now move towards thepreparation of a pre-feasibility study, further drilling, metallurgical testwork and engineering optimisation should continue to improve the economicreturns of Baomahun.' Qualified Person: Douglas D Chikohora has reviewed the information contained in this announcement.Douglas D Chikohora, MSc, MIMMM, CEng, is the Technical Director of the Company. For further information, please contact: Cluff Gold plc J.G. Cluff / Douglas Chikohora Chairman / Technical Director Tel: +44 (0)20 7340 9790 WH Ireland Limited David Youngman Tel: +44 (0)161 832 2174 Parkgreen Communications Louise Goodeve / Justine Howarth Tel: +44 (0)20 7851 7480 Notes to Editors Baomahun is located about 180 kilometres east of the capital, Freetown, in theSouthern Province of Sierra Leone and the geological setting is similar to theLake Victoria goldfields in Tanzania. Cluff Gold has earned a 60% in Baomahunhaving spent US$5 million as per the earn in agreement with Winston MinesLimited. Baomahun covers an area of about 137 km2. Exploration to date hasdelineated a JORC Compliant Resource of 11.2 million tonnes at 3.2g/t gold for1.16 million ounces gold. Drilling has so far covered less than 25% of theprospective trend. Further drilling for along strike and down dip extensions tomineralisation is planned. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
28th May 20102:41 pmRNSForm 8.3 - Cluff Gold Plc
28th May 20109:54 amRNSForm 8.5 (EPT/NON-RI)
27th May 20103:20 pmRNSForm 8.3 - Cluff Gold Plc
27th May 20103:20 pmRNSForm 8.3 - Cluff Gold Plc
27th May 201011:41 amRNSForm 8.5 (EPT/RI)
27th May 201011:38 amRNSForm 8.5 (EPT/NON-RI)
26th May 20103:10 pmRNSForm 8.3 - Cluff Gold Plc
26th May 201011:28 amRNSForm 8.5 (EPT/RI)
26th May 201011:23 amRNSForm 8.5 (EPT/NON-RI)
25th May 20103:20 pmEQSDGAP-UK-Regulatory: S.u.P. Taurus SICAV-FIS: Cluff Gold plc
25th May 20103:13 pmRNSForm 8.3 - Cluff Gold Plc
25th May 201011:46 amRNSForm 8.5 (EPT/RI)
25th May 201010:19 amRNSForm 8.5 (EPT/NON-RI)
25th May 20107:01 amRNSPreliminary Results
25th May 20107:00 amRNSBaomahun Preliminary Assessment Update
24th May 20103:04 pmRNSForm 8.3 - Cluff Gold PLC
24th May 201011:32 amRNSForm 8.5 (EPT/RI)
24th May 201011:24 amRNSForm 8.5 (EPT/NON-RI)
21st May 20104:19 pmRNSForm 8.3 - Cluff Gold Plc
21st May 20103:55 pmRNSForm 8.5 (EPT/NON-RI)- Replacement
21st May 201010:39 amRNSForm 8.5 (EPT/RI)
21st May 20109:56 amRNSForm 8.5 (EPT/NON-RI)
20th May 20104:53 pmPRNForm 8.3 - Cluff Gold plc
20th May 20109:55 amRNSForm 8.5 (EPT/NON-RI)
19th May 201011:28 amRNSForm 8.5 (EPT/RI) - Amendment
19th May 201010:35 amRNSForm 8.5 (EPT/NON-RI)
19th May 20109:46 amRNSForm 8.5 (EPT/RI)
18th May 201010:21 amRNSForm 8.5 (EPT/NON-RI)
18th May 201010:11 amRNSForm 8.5 (EPT/RI)
17th May 20102:06 pmRNSForm 8.3 - Cluff Gold Plc
17th May 201010:41 amRNSForm 8.5 (EPT/NON-RI)
17th May 20109:33 amRNSForm 8.5 (EPT/RI)
14th May 20109:52 amRNSForm 8.5 (EPT/NON-RI)
13th May 20101:48 pmRNSForm 8.3 - Cluff Gold Plc
13th May 201011:09 amRNSForm 8.5 (EPT/NON-RI)
13th May 20109:40 amRNSForm 8.5 (EPT/RI)
12th May 20102:31 pmRNSForm 8.3 - Cluff Gold Plc
12th May 201010:28 amRNSForm 8.5 (EPT/NON-RI)
11th May 20105:13 pmPRNForm 8.3 - Cluff Gold PLC
11th May 20104:12 pmRNSForm 8.3 - Cluff Gold plc
11th May 20102:53 pmBUSForm 8.3 - Cluff Gold PLC
11th May 201011:39 amRNSForm 8.5 (EPT/RI)
10th May 20102:28 pmRNSForm 8.3 - Cluff Gold Plc
7th May 20102:34 pmRNSForm 8.3 - Cluff Gold Plc
6th May 201010:07 amRNSForm 8.5 (EPT/RI)
5th May 20109:55 amRNSForm 8.5 (EPT/RI)
4th May 20101:55 pmRNSForm 8 (OPD) - Cluff Gold PLC
4th May 201010:40 amRNSForm 8.5 (EPT/RI)
30th Apr 20102:37 pmRNSTotal Voting Rights
30th Apr 20107:00 amRNSUpdate on Possible Offer

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.