If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmara Mining Regulatory News (AMA)

  • There is currently no data for AMA

Baomahun Resource Increase

11 Sep 2006 07:01

Cluff Gold PLC11 September 2006 CLUFF GOLD PLC Cluff Increases Gold Resource by 70% at Baomahun in Sierra Leone Cluff Gold Plc ("Cluff" or "the Company") today announces that SRK Consulting ("SRK") has concluded a resource update on the Baomahun Gold Project, SierraLeone. Key highlights - Resource increased by 70% to 880,000 ounces with an average grade of 3.2 g/t - The majority of the prospective corridor is yet to be drill tested - The mineralisation remains open at depth and along strike - Further drilling planned in October, following the seasonal rains - High grade zone intersected at a depth of 200 metres in the Eastern Zone This resource update follows the completion of a recent 4400 metre core drillingprogramme which was undertaken in a small area of the twelve kilometre strikelength within the project licence area which is situated along the prospectiveKangari Hills Greenstone Belt. SRK has derived a Mineral Resource, as defined bythe JORC code, of 8.65 million tonnes at a mean grade of 3.2g/t on the Eastern,Central and Western Zones as per Table 1 below. High grade samples were cut to40g/t.Au. The mineralisation remains open at depth and along strike on the threeZones. The airborne geophysical surveys which were completed last year picked up anextensive banded iron formation ("BIF") and this formation has been found to beintimately associated with high grade gold mineralisation in the drilled areas.Future exploration will use the BIF as a marker horizon for auriferous (goldbearing) zones in the belt. Table 1: Total Resources - Baomahun Project Resource Class Resource Area Tonnage Grade Gold Content (kt) (g/t.Au) (Oz)Indicated East 240 5.0 40,000 Inferred East 2,080 4.8 320,000Inferred Central 2,210 3.9 280,000Inferred West 4,120 1.9 250,000 Total Indicated East 240 5.0 40,000Total Inferred All areas 8,410 3.1 840,000 All Categories All Areas 8,650 3.2 880,000 Mr. Douglas Chikohora, Technical Director of Cluff Gold plc comments, "We arevery pleased with the latest resource update by SRK which has surpassed ourexpectations and serves to substantiate the recent independent report from L RKilpatrick which stated that this project has the potential to be a multimillion ounce deposit. We are also very pleased to have achieved these resultsat a discovery cost of less than US$5/oz. We expect to make further progresswhen drilling resumes in October this year after the rainy season, as themajority of the strike length is still to be defined." About Baomahun: Baomahun is located about 180 km east of the capital, Freetown, in the SouthernProvince of the country and the geological setting is similar to the LakeVictoria goldfields in Tanzania. Cluff has a right to earn a 60% interest inBaomahun by funding the project to the completion of a bankable feasibilitystudy or to a maximum of US$5 million. This right is to be acquired fromWinston Mines which owns the two exploration licences relating to Baomahun,covering an area of approximately 137 km(2). Qualified Person: The Mineral Resource Estimate presented here has been carried out on behalf ofSRK Consulting by Dr. Simon Ingram (MIOM3). Dr Ingram has sufficient experiencewhich is relative to the style of mineralisation and type of deposit underconsideration, and to the activity which he is undertaking, to qualify as aCompetent Person as defined in the 2004 edition of the 'Australasian Code forReporting of Exploration Results, Mineral Resources and Ore Reserves'. Dr Ingramconsents to the inclusion in this press release of the matters based on hisinformation in the form and context in which it appears. For further information, please contact: Cluff Gold WH Ireland Parkgreen CommunicationsJ.G. Cluff / Douglas Chikohora David Youngman Cathy Malins / Annabel LeatherChairman / Technical Director Tel: 0161 832 2174 Tel: 020 7493 3713 Tel: 020 7340 9790 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
16th Jul 20137:00 amRNSYaoure Gold Project Update
8th Jul 20131:40 pmRNSDIRECTORS' DEALINGS
3rd Jul 20134:40 pmRNSDIRECTORS' DEALINGS
2nd Jul 20137:00 amRNSBaomahun Feasibility Study
27th Jun 201310:10 amRNSNOTICE OF BAOMAHUN FEASIBILITY STUDY
12th Jun 20134:35 pmRNSPrice Monitoring Extension
5th Jun 201311:59 amRNSResult of AGM
22nd May 20137:00 amRNSQ1 2013 RESULTS
21st May 20137:00 amRNSGRANTING OF ENVIRONMENTAL PERMIT FOR SEGA PROJECT
13th May 20137:00 amRNSPOSTING OF ANNUAL REPORT AND NOTICE OF AGM
10th May 20137:00 amRNSFILING OF YAOURE TECHNICAL REPORT
30th Apr 20137:00 amRNSRECEIPT OF PERMITS FOR KALSAKA/SEGA HAUL ROAD
10th Apr 20134:00 pmRNSDirectors' Dealings
5th Apr 20134:35 pmRNSPrice Monitoring Extension
2nd Apr 20133:30 pmRNSDirectors' Dealings
27th Mar 20137:00 amRNS2012 AUDITED FULL YEAR RESULTS
25th Mar 20137:00 amRNSResource Update for Yaoure Gold Project
16th Oct 20127:00 amRNSPEA and Exploration Update for the Sega Project
3rd Oct 20127:00 amRNSConfirmation of change of ticker
1st Oct 20127:00 amRNSChange of name and corporate update
12th Sep 20127:00 amRNSStrategic Alliance between Cluff Gold and Samsung
24th Feb 20115:33 pmRNSResignation of Non-Executive Director
26th Jan 20117:00 amRNSOperational and Strategic Review for 2011
23rd Dec 20103:04 pmRNSAdditional Listing of 182,565 ordinary shares
22nd Dec 20103:59 pmRNSDirector's Dealings
21st Dec 20104:21 pmRNSDirectors' Shareholdings
1st Dec 20107:00 amRNSFinal VTEM Results for Baomahun Gold Project
30th Nov 20107:00 amRNSKalsaka Exploration Drilling Update
1st Nov 201011:06 amRNSAdditional Listing
28th Oct 20107:00 amRNSUS$15M Private Placement with Macquarie Bank
12th Oct 20105:00 pmRNSHolding(s) in Company
12th Oct 201011:49 amRNSHolding(s) in Company
8th Oct 20101:05 pmRNSHolding(s) in Company
6th Oct 20104:24 pmRNSAdditional Listing
29th Sep 20107:00 amRNS2010 Interim Results
9th Sep 20107:00 amRNSH1 2010 Trading Update
3rd Sep 20107:00 amRNSDirectorate Change
13th Aug 20105:42 pmRNSTECHNICAL REPORT ON BAOMAHUN FILED ON SEDAR
28th Jul 20105:10 pmRNSDirector/PDMR Shareholding
6th Jul 20109:49 amRNSGrant of Options to Directors
30th Jun 201011:58 amRNSResults of the Prelim Assessment for Baomahun Gold
29th Jun 20107:00 amRNSResult of AGM and new Board appointments
15th Jun 201011:42 amRNSPosting of Annual Report
4th Jun 20107:00 amRNSIncreased Mineral Resource Estimate at Baomahun
2nd Jun 20102:57 pmRNSForm 8.3 - Cluff Gold Plc
2nd Jun 201011:37 amRNSForm 8.5 (EPT/NON-RI)
1st Jun 20105:41 pmRNSTermination of Offer Talks
1st Jun 20103:05 pmRNSForm 8.3 - Cluff Gold Plc
1st Jun 201011:11 amRNSForm 8.5 (EPT/NON-RI)
1st Jun 201010:11 amRNSForm 8.5 (EPT/RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.