Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmara Mining Regulatory News (AMA)

  • There is currently no data for AMA

Baomahun Resource Doubles

8 Nov 2005 07:01

Cluff Gold PLC08 November 2005 CLUFF GOLD PLC Baomahun gold project, Sierra Leone - Resource more than doubles to 500,000 ounces - 75% of prospective corridor yet to be drilled - Prospects for open pit cluster mining enhanced Cluff Gold Plc ("Cluff" or "the Company") today announces that SRK Consulting ("SRK") has prepared an up to date resource estimate for the Baomahun GoldProject, Sierra Leone. This follows the recent completion of a 4600 metre coredrilling programme which covered less than 25% of the known strike extent of thegold in soil anomaly on the licence. SRK's estimate has been reported inaccordance with the JORC Code and comprises a total Mineral Resource of some4.54 million tonnes with a mean grade of 3.6 g/t Au (just over 500,000 ounces).All three zones drilled to date remain open at depth. ZONE CLASSIFICATION TONNES ('000) Grade (g/t) Contained Au (Oz)East Indicated 160 5.1 27,000 East Inferred 1,770 4.3 242,000Central Inferred 530 4.0 67,000West Inferred 2,080 2.7 182,000 Sub-Total Inferred 4,380 3.5 491,000 Totals All Zones Indicated + Inferred 4,540 3.6 518,000 The Baomahun licence area covers more than 12 kilometres of strike along theKangari Hills greenstone belt. The airborne geophysical surveys conductedearlier in the year, on the belt, picked up extensive banded iron formation ("BIF"). This formation has been found to be intimately associated with high gradegold mineralisation in the drilled areas. Future exploration will use the BIF asa marker horizon for auriferous zones in the belt. Mr. Douglas Chikohora, Technical Director of Cluff Gold plc, comments, "Theresource update by SRK surpassed our expectations and strengthened our view thatthe Baomahun Project has potential to host a much bigger deposit than weoriginally thought. Seventy five percent of the prospective corridor is yet tobe drilled. We believe this work will generate targets amenable to open pitcluster mining. We expect low stripping ratios from future mining given the hillslope location of the mineralised zones." About Baomahun: Baomahun is located about 180 km east of the capital, Freetown, in the SouthernProvince of the country and the geological setting is similar to the LakeVictoria goldfields in Tanzania. Cluff has a right to earn a 60% interest inBaomahun by funding the project to the completion of a bankable feasibilitystudy or to a maximum of US$5 million. This right is to be acquired fromWinston Mines which owns the two exploration licences relating to Baomahun,covering an area of approximately 137 km(2). For further information, please contact: Cluff Gold Numis Securities Parkgreen CommunicationsJ.G. Cluff / John Harrison Justine Howarth /Douglas Chikohora Tel: +44 (0) 20 7776 1500 Cathy Malins Chairman / Tel: +44 (0) 20 7493 3713 Technical Director Tel: +44 (0) 20 7340 9790 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
16th Jul 20137:00 amRNSYaoure Gold Project Update
8th Jul 20131:40 pmRNSDIRECTORS' DEALINGS
3rd Jul 20134:40 pmRNSDIRECTORS' DEALINGS
2nd Jul 20137:00 amRNSBaomahun Feasibility Study
27th Jun 201310:10 amRNSNOTICE OF BAOMAHUN FEASIBILITY STUDY
12th Jun 20134:35 pmRNSPrice Monitoring Extension
5th Jun 201311:59 amRNSResult of AGM
22nd May 20137:00 amRNSQ1 2013 RESULTS
21st May 20137:00 amRNSGRANTING OF ENVIRONMENTAL PERMIT FOR SEGA PROJECT
13th May 20137:00 amRNSPOSTING OF ANNUAL REPORT AND NOTICE OF AGM
10th May 20137:00 amRNSFILING OF YAOURE TECHNICAL REPORT
30th Apr 20137:00 amRNSRECEIPT OF PERMITS FOR KALSAKA/SEGA HAUL ROAD
10th Apr 20134:00 pmRNSDirectors' Dealings
5th Apr 20134:35 pmRNSPrice Monitoring Extension
2nd Apr 20133:30 pmRNSDirectors' Dealings
27th Mar 20137:00 amRNS2012 AUDITED FULL YEAR RESULTS
25th Mar 20137:00 amRNSResource Update for Yaoure Gold Project
16th Oct 20127:00 amRNSPEA and Exploration Update for the Sega Project
3rd Oct 20127:00 amRNSConfirmation of change of ticker
1st Oct 20127:00 amRNSChange of name and corporate update
12th Sep 20127:00 amRNSStrategic Alliance between Cluff Gold and Samsung
24th Feb 20115:33 pmRNSResignation of Non-Executive Director
26th Jan 20117:00 amRNSOperational and Strategic Review for 2011
23rd Dec 20103:04 pmRNSAdditional Listing of 182,565 ordinary shares
22nd Dec 20103:59 pmRNSDirector's Dealings
21st Dec 20104:21 pmRNSDirectors' Shareholdings
1st Dec 20107:00 amRNSFinal VTEM Results for Baomahun Gold Project
30th Nov 20107:00 amRNSKalsaka Exploration Drilling Update
1st Nov 201011:06 amRNSAdditional Listing
28th Oct 20107:00 amRNSUS$15M Private Placement with Macquarie Bank
12th Oct 20105:00 pmRNSHolding(s) in Company
12th Oct 201011:49 amRNSHolding(s) in Company
8th Oct 20101:05 pmRNSHolding(s) in Company
6th Oct 20104:24 pmRNSAdditional Listing
29th Sep 20107:00 amRNS2010 Interim Results
9th Sep 20107:00 amRNSH1 2010 Trading Update
3rd Sep 20107:00 amRNSDirectorate Change
13th Aug 20105:42 pmRNSTECHNICAL REPORT ON BAOMAHUN FILED ON SEDAR
28th Jul 20105:10 pmRNSDirector/PDMR Shareholding
6th Jul 20109:49 amRNSGrant of Options to Directors
30th Jun 201011:58 amRNSResults of the Prelim Assessment for Baomahun Gold
29th Jun 20107:00 amRNSResult of AGM and new Board appointments
15th Jun 201011:42 amRNSPosting of Annual Report
4th Jun 20107:00 amRNSIncreased Mineral Resource Estimate at Baomahun
2nd Jun 20102:57 pmRNSForm 8.3 - Cluff Gold Plc
2nd Jun 201011:37 amRNSForm 8.5 (EPT/NON-RI)
1st Jun 20105:41 pmRNSTermination of Offer Talks
1st Jun 20103:05 pmRNSForm 8.3 - Cluff Gold Plc
1st Jun 201011:11 amRNSForm 8.5 (EPT/NON-RI)
1st Jun 201010:11 amRNSForm 8.5 (EPT/RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.