Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAfrican Eagle Resources Regulatory News (AFE)

  • There is currently no data for AFE

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

12 Jun 2006 07:00

African Eagle Resources PLC12 June 2006 African Eagle Resources plc ("the Company" or "African Eagle") DRILLING UPDATE FROM MKUSHI COPPER MINES African Eagle Resources plc ("the Company" or "African Eagle", ticker AFE),announces further excellent results from its ongoing resource definitiondrilling programme at Mkushi Copper Mines in central Zambia. Best mineraliseddrill intercepts include: €27m at 2.1% copper €61m at 1.4% copper €52m at 1.3% copper €132m at 0.5% copper €73m at 0.6% copper African Eagle's Managing Director Mark Parker comments "Mkushi is givingconsistently good results and it now compares very favourably with other copperprojects being brought into production in southern Africa. The latest resultsare from a mineralised body to the southwest of the old open pit. So far, wehave outlined 12 to 14 million tonnes at an average grade between 0.7 and 1.2%copper in this body, according to our preliminary estimates. Drilling continuesand we expect to announce an independent resource estimate during Q3, with adevelopment scoping study soon after. "African Eagle believes that Mkushi will add up to a substantial copper deposit,which internal economic modelling indicates should be profitable across a widerange of copper prices. Our recent £3.3M financing will enable us to acceleratethe project towards feasibility and development." The new results are from the southwest extension of a copper deposit which wasmined by an open pit in the 1960s and 1970s. African Eagle has now traced thisbody, known as "H-Zone", for at least 800m along strike and down to 160 verticalmetres below surface. The zone is up to 60m wide and should therefore besuitable for open pit development. Preliminary geological modelling of H-Zone by African Eagle's geologists, basedon the drill results to date, indicates a potential of at least 12 to 14 milliontonnes with grades of the order of 0.7 to 1.2%, to a depth of 150 verticalmetres below surface. This estimate includes only that part of the mainmineralised body drilled to date and does not take into account a smallerparallel body. As a priority, African Eagle now intends to complete sufficientadditional drilling to allow an independently audited JORC resource estimate tobe prepared during the third quarter of 2006. There is also considerable scope to add to the resource at Mkushi by drillingother mineralised zones. A resource estimate of 30.4 million tonnes grading1.23% copper, equating to more than 370,000 tonnes of copper metal, was made in1990, based on the four mineralised zones for which drill reports were thenavailable. Already the preliminary tonnage estimate for H-Zone alone accountsfor more than one third of this figure and the other known zones and potentialnew ones identified by African Eagle's geologists remain to be evaluated. Past mining from the open pit yielded 2.2 million tonnes of ore at an averagegrade of 1% copper, but the pit reached a depth of only 30 metres and archivereports indicate that considerable resources remain beneath the old workings.The Company plans to drill this area once the old pit can be pumped dry. Moreover, there are known mineralised zones which have never been drilled andAfrican Eagle's induced polarisation geophysical surveys have identified manyother chargeable zones which may be additional copper resources elsewhere withinthe prospecting licence. African Eagle has now completed 48 inclined diamond and percussion drill holesfor a total of 7906m at the Mkushi Copper Mines. The principal results of thelatest drilling are tabulated below. A table of all mineralised drill interceptsto date and a map showing key drill results from H-Zone can be viewed atwww.africaneagle.co.uk/projects-mkushi2.html Drill Hole Hole Type From* (m) Interval (m) Copper (Cu) %MH14 diamond 161 61 1.4including 175 7 5.8and 236 5 1.9MH15 diamond 53 6 2.7and 95 52 1.3MH22 percussion 127 27 2.1MH29 percussion 14 73 0.6MH30A percussion 6 132 0.5MH31 percussion 16 53 0.5MH33 percussion 34 72 0.4MH37 percussion 12 120 0.5Including 28 18 1.5and 85 8 1.2* Down-hole depth John ParkChairmanAfrican Eagle Resources plc12 June 2006 About African Eagle African Eagle is a mineral resources company operating in eastern and centralAfrica. It holds projects in Zambia, Tanzania and Mozambique, countries withhighly prospective geology and low above-ground risks, which have all beendestinations for successful recent major investments in the metals and mineralsindustries. The Company has a highly motivated team, proven management and an experiencedboard. Its principal operation is the Mkushi Copper Mines projects in Zambia. Italso holds the Miyabi gold project in Tanzania, the Ndola copper project in theZambian Copperbelt and has discovered a large iron oxide copper gold (IOCG)system at Eagle Eye in Zambia. There is also a well-balanced portfolio ofpromising early stage exploration projects. About Mkushi Copper Mines Discovered in 1922, the Mkushi deposits were first mined by undergroundworkings, then developed as an open pit operation in the late 1960s. The mineclosed around the time of Zambia's nationalisation of the copper industry in the1970s, but archive reports indicate that there is still abundant ore left in theground. African Eagle Resources acquired the Mkushi Copper Mines in 2002 througha share-based acquisition of an Australian exploration company and is nowdrilling to confirm and expand the known copper resource. The local infrastructure around Mkushi is excellent and the brownfield siteshould make it straightforward to obtain permits for renewed operations. Thedeposits have simple chalcopyrite mineralogy which should allow a concentrate tobe produced efficiently at relatively modest capital cost. Mkushi is the onlyZambian copper mine in rocks older than the Katangan sequence which hosts thewell known Copperbelt deposits. African Eagle is also exploring a wide area surrounding the old mines.Geophysical induced polarisation surveys, which to date cover almost 30 squarekilometres, have revealed additional anomalies in the area, which African Eaglebelieves could bring the total resource to 50Mt at 1% or more copper, with500,000 tonnes of contained metal. The Company is conducting a full resource drilling programme and economicevaluation at Mkushi, leading to a full feasibility study during 2007, with aview to taking the project to commercial production. Qualified Person Information in this report relating to the exploration results is based on datareviewed by Mr Christopher Davies B.Sc, M.Sc, DIC, Operations Director forAfrican Eagle Resources, who is a Fellow of the Australasian Institute of Miningand Metallurgy, has in excess of 25 years experience in mineral exploration andis a Qualified Person under AIM Rules. Mr Davies consents to the inclusion ofthe information in the form and context in which it appears. For further information, see the Company's web site www.africaneagle.co.uk orcontact one of the following: Mark ParkerManaging Director+44 20 7248 6059+44 77 5640 6899 Chris DaviesOperations Director+44 20 7248 6059+44 78 6672 9959 Leesa PetersConduit PR+44 20 7429 6600+44 78 1215 9885 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
6th Feb 20074:49 pmRNSDirector Shareholding
31st Jan 20077:01 amRNSProgress Report
28th Dec 20067:00 amRNSTotal Voting Rights
13th Dec 20067:01 amRNSDrilling Report
30th Oct 20067:01 amRNSDep ChairAppt/Drill Results
26th Sep 20068:00 amRNSMkushi 1st Resource Estimate
25th Sep 20067:02 amRNSInterims & Progress Review
8th Aug 20067:01 amRNSEarn In Agreement at Ndola
28th Jul 20067:01 amRNSStrategic Dev Partner
21st Jul 20067:00 amRNSDrilling Report
23rd Jun 200610:22 amRNSDirector Shareholding
12th Jun 20067:00 amRNSDrilling Report
1st Jun 20067:00 amRNSFinal Results
22nd May 20069:58 amRNSIssue of Equity
3rd May 20063:00 pmRNSOption with MDN
24th Apr 20068:33 amRNSMineSite Presentations
20th Apr 20065:26 pmRNSAdditional Listing
7th Apr 20067:00 amRNSDrilling Update
27th Mar 20067:38 amRNSChange of Adviser etc.
21st Mar 20067:01 amRNSUpdated Resource Estimate
15th Mar 20064:14 pmRNSDirector/PDMR Shareholding
24th Feb 20067:01 amRNSIssue of Equity
6th Feb 20067:01 amRNSDrilling Report
3rd Feb 200611:27 amRNSRe Joint Venture
19th Dec 20057:01 amRNSDrilling Report
19th Dec 20057:01 amRNSDrilling Report
14th Dec 20055:23 pmRNSHolding(s) in Company
30th Nov 20057:00 amRNSRe Ndola Project
24th Nov 200511:21 amRNSHolding(s) in Company
23rd Nov 20057:00 amRNSDrilling Report
7th Nov 200512:54 pmRNSHolding(s) in Company
7th Nov 20059:05 amRNSHolding(s) in Company
3rd Oct 20053:44 pmRNSHolding(s) in Company
30th Sep 200512:11 pmRNSHolding(s) in Company
29th Sep 20057:03 amRNSInterim Results
6th Sep 20057:00 amRNSDrilling Report
17th Aug 20054:31 pmRNSHolding(s) in Company
17th Aug 200510:02 amRNSSAR 3-African Eagle Resources
15th Aug 20057:00 amRNSDrilling Report
5th Aug 20057:00 amRNSLicence award
19th Jul 200510:45 amRNSDirector/PDMR Shareholding
4th Jul 20058:25 amRNSDirector/PDMR Shareholding
28th Jun 20057:00 amRNSDrilling Report
14th Jun 20057:00 amRNSDrilling Report
1st Jun 20057:00 amRNSFinal Results
31st May 20057:00 amRNSHolding & warrant exercise
27th May 20057:00 amRNSTanzanian joint venture
23rd May 20057:01 amRNSJoint Venture in Zambia
20th May 20057:00 amRNSChange of Adviser
20th Apr 20057:00 amRNSDrilling Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.