The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAFC Energy Regulatory News (AFC)

Share Price Information for AFC Energy (AFC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 18.44
Bid: 18.24
Ask: 18.56
Change: -0.06 (-0.32%)
Spread: 0.32 (1.754%)
Open: 18.48
High: 18.60
Low: 18.10
Prev. Close: 18.50
AFC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

POWER-UP Update - May 2015

13 May 2015 07:00

RNS Number : 9862M
AFC Energy Plc
13 May 2015
 

13 May 2015

 

 

AFC Energy PLC

("AFC" or the "Company")

 

 

POWER-UP Update - May 2015

 

AFC Energy plc (AFC.L), the industrial fuel cell power company, is pleased to provide an update on progress towards delivery of the Company's first 240kW KORE system at Air Products' Stade facility in Germany.

 

Highlights

 

· POWER-UP schedule remains on track for initial power production in July 2015

· Successful completion of KORE HAZOP review

· Successful completion of initial HAZOP review of KORE buildings, utilities and facilities, follow up actions underway

· Successful completion of explosion protection study of KORE in Germany

· Concluding phases of final building permit

· Deep foundations and site preparation works completed on site

· KORE construction ongoing with completion expected in time for July 2015 start up at Stade

 

 

Significant developments over the past few months include:

 

· Following a process hazard assessment of the KORE fuel cell module design using the Hazard and Operability (HAZOP) methodology, the KORE has passed a further independent and rigorous examination of its design safety functions. This is a significant step in the design validation of AFC Energy's fuel cell technology and builds upon the HAZOP undertaken previously by Foster Wheeler in October 2013. The HAZOP review was organised and moderated by leading German process engineering consultancy plantIng GmbH, with the support of AFC, the consultancy firm Efficientics and industrial gas partner Air Products plc. It was performed in AFC Energy's Dunsfold offices during a two day session on 25-26.03.2015. In the HAZOP method used, the set of piping and instrumentation diagrams (P&ID) of the KORE module were examined in small sections. Each of these has a specified design intention. Parameters which describe the design intent were then evaluated systematically in order to identify deviations and evaluate their effect. During the review, experienced process safety engineers led a multi-disciplinary engineering team in a robust examination of all safety aspects and functions of the KORE balance of plant and cartridges design. The output of this process has been a HAZOP report with clear actions and responsible parties defined to maximise process safety. These actions have now been implemented by AFC.

 

· Following the KORE HAZOP review in March 2015, AFC commissioned and received an explosion protection report drafted by the German consultancy firm Efficientics according to German industrial health and safety regulations and relevant technical standards. This report has confirmed that the KORE system assembly is classified as a "safe area", i.e. there is no area within the KORE module where an explosive atmosphere may occur, i.e. an ATEX zone. This result, in conjunction with the recent successful conclusion of the KORE HAZOP review, establishes the inherent safety of the KORE module design for use in an industrial setting.

 

· A further process hazard assessment of the structure and facilities designed to house the KORE system in Stade was undertaken using the HAZOP methodology. This subsequent review took place in two sessions, in Cologne on 10-11.02.2015 and in Hamburg on 28-29.04.2015 and was again led by engineering consultancy plantIng GmbH. The results of this review again provided a positive response to the safety accreditation of the building and facilities designed to integrate with the KORE operations on site in Stade. All recommendations and actions arising from the facilities HAZOP are being addressed by AFC. This is the first time a HAZOP has been undertaken on the facilities set to house the KORE and further validates the robust design being adopted by AFC across the integrated hydrogen supply, facilities, structures and KORE system within an industrial setting.

 

· In addition to the KORE module and associated facilities, a HAZOP has also been completed regarding the Air Products hydrogen let down station and supply pipeline to the AFC facility. Orders have been placed for all key hydrogen supply components required for connection to the KORE plant.

 

· AFC and its advisers, Artelia and plantIng, are continuing to work closely with local regulatory authorities on the final building permit for the Stade facility. We are confident this process is drawing towards a successful conclusion over the coming weeks and will provide the basis for construction of the remaining aspects of the Stade facility necessary to house the KORE system and associated utilities and infrastructure.

 

· Work has now been completed with regards the deep foundations of the facilities that will house the KORE system. This work has been completed to schedule and to budget. Final activities are now being concluded with regards the shallower foundations for the plant; these are expected to be completed over the coming weeks.

 

· The KORE module itself continues to be developed and constructed in Coventry, UK, and is on target for completion in time to allow commencement of operations at Stade in July 2015.

 

In summary, the POWER-UP schedule of works continues in accordance with the schedule outlined in AFC's RNS dated 8 December 2014, with commencement of operation still anticipated in July 2015.

 

Mr Adam Bond, AFC's Chief Executive Officer, said: "We continue to make great progress towards the successful deployment of AFC's first KORE system in Germany in the second half of this year. The challenging target set in fast tracking the deployment timetable by 18 months, and having the KORE delivered and operational by July 2015, has to date proven deliverable and we continue to wait in anticipation of a successful demonstration of the KORE system in July."

 

For further information, please contact:

AFC Energy plc

Adam Bond (Chief Executive Officer)

 

 

+44 (0) 20 3697 1209

Zeus Capital Limited - Nominated Adviser and Joint Broker

John Treacy, Phil Walker

Alex Davies, John Goold  

 

+44 (0) 20 7533 7727

 

M C Peat & Co LLP - Joint Broker

Charlie Peat

 

+44 (0) 20 7104 2334

Lionsgate Communications - Public Relations

Jonathan Charles, Rachel Rigby

 

 

+44 (0) 20 3697 1209

 

About AFC Energy

 

AFC Energy plc is in the process of commercialising its proven low-cost alkaline fuel cell system, which converts hydrogen into 'clean' electricity. AFC's key project POWER-UP will demonstrate the world's largest alkaline fuel cell system at Air Products' industrial gas plant in Stade, Germany. The date for the demonstration of the 240kW "KORE" system has been fast tracked to December 2015, representing the final phase of AFC's pre-commercialisation technical development programme and creating the platform for the Company's global commercial fuel cell deployment. AFC has also recently announced the development of projects in Asia and the Middle East. For further information, please visit our website: www.afcenergy.com

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
STRATMLTMBABBFA
Date   Source Headline
2nd May 20247:00 amRNSGrant of Share Options
25th Apr 20242:00 pmRNSAGM Results and Appointment of SID
25th Apr 202412:00 pmRNSBlock Listing Return
10th Apr 20247:00 amRNSNotice of Capital Markets Event
28th Mar 20241:00 pmRNSNotice of 2024 AGM
26th Mar 20247:00 amRNSQ&A session via Investor Meet Company
15th Mar 20241:00 pmRNSTotal Voting Rights
14th Mar 20247:00 amRNSS Series Fuel Cell Operating Cost Milestone
11th Mar 20247:00 amRNSFirst Factory Acceptance Test of 30kW Generator
4th Mar 20247:00 amRNSGenerator Attestation of Conformity for CE Mark
28th Feb 20247:00 amRNSAmmonia Cracker Milestones Achieved
26th Jan 20247:00 amRNSFunding Secured for Maritime Ammonia Cracker Trial
18th Dec 20237:00 amRNSAppointment of Additional Corporate Broker
4th Dec 20237:00 amRNSWorld First Ammonia Cracking Pilot
17th Nov 20237:00 amRNSPurchase of Assets from Octopus Hydrogen
15th Nov 20237:00 amRNSLaunch of Speedy Hydrogen Solutions & First Orders
25th Oct 20237:00 amRNSBlock Listing Return and Correction
23rd Oct 202312:00 pmRNSLaunch of 2023 SAYE Scheme
23rd Oct 20237:00 amRNSAmmonia Cracker Technology Milestone Achieved
4th Sep 20237:00 amRNSExclusive Distribution Agreement with TAMGO
8th Aug 202310:41 amRNSDirector/PDMR Shareholding
31st Jul 20237:00 amRNSInterim Results
28th Jul 20237:00 amRNSProposed Launch of Speedy Hire Joint Venture
27th Jul 20237:00 amRNSAppointment of Non-Executive Director
26th Jul 20237:00 amRNSAFC Energy Secures £4.3m UK Government Grant
18th Jul 20237:00 amRNSStade Update
16th Jun 20232:01 pmRNSDirector/PDMR Shareholding
6th Jun 20237:00 amRNSBoard Changes
1st Jun 20233:52 pmRNSDirector/PDMR Shareholding
1st Jun 20237:00 amRNSGrant of Share Options
11th May 20237:00 amRNSNon-Executive Director Retirement
2nd May 20239:25 amRNSDirector/PDMR Shareholding
28th Apr 20237:00 amRNSGrant of Options
28th Apr 20237:00 amRNSNotice of Investor Presentation
28th Apr 20237:00 amRNSAnnual General Meeting Results
25th Apr 20233:58 pmRNSBlock Listing Return
21st Apr 20236:03 pmRNSAnnual Financial Report
19th Apr 20237:00 amRNSACCIONA Orders First 50kVA H-Power Generator
4th Apr 20237:00 amRNSNotice of AGM
29th Mar 20237:05 amRNSABB E-mobility Follow On Investment
29th Mar 20237:00 amRNSABB Milestone Validation
23rd Mar 20237:00 amRNS“Ammonia to Hydrogen” Cracker Technology Launch
9th Mar 20237:00 amRNSH-Power Tower Deployment Update
7th Mar 20237:00 amRNSAppointment of New Business Development Manager
17th Jan 20234:40 pmRNSSecond Price Monitoring Extn
17th Jan 20234:35 pmRNSPrice Monitoring Extension
1st Dec 20227:00 amRNSPeter Dixon Clarke Appointment
23rd Nov 202211:49 amRNSHS2 Fuel Cell Tower
7th Nov 20227:00 amRNSMethanol Fuel Tower Field Trial
3rd Oct 20227:00 amRNSACCIONA Power Tower Deployment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.