The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.80
Bid: 0.75
Ask: 0.85
Change: 0.00 (0.00%)
Spread: 0.10 (13.333%)
Open: 0.80
High: 0.80
Low: 0.80
Prev. Close: 0.80
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exceptionally High-Grade Assay Results

25 Jun 2019 07:00

 

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

25 June 2019

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Exceptionally High-Grade Assay Results Verify Commercialisation Plans

for the Mahenge Liandu Graphite Project

Armadale Capital plc (LON: ACP), the AIM quoted investment group focused on natural resource projects in Africa, is delighted to announce exceptionally high-grade assay results from its Mahenge Liandu Graphite Project (‘Mahenge Liandu’ or the ‘Project’) in Tanzania, which validate commercialisation plans in progression (see RNS dated 29 May 2019).

Highlights

First four of 18-hole reverse circulation (‘RC’) drill programme receivedExceptionally high-grade near surface assayed intercepts recorded7m @ 16.9% total graphite content (‘TGC’) from 31m7m @ 16.8% TGC from surface9m @ 14.8% TGC from surfaceEncouraging results are part of broader zone of high-grade mineralisation that includes 39m @ 11.2% TGC from surface, 57m @ 7.6% TGC from surface and 63m @ 8% TGC from 12mWide zones of high-grade near surface mineralisation materially above the 12.5% used in the average life of mine scoping study completed in March 2018Eight diamond drill-holes also drilled and are currently being assayedResults have favourable impact on the Project’s economics and forward commercialisation plans:Higher average grade from near surface mining in early yearsLower extraction costsPotential enhanced EBITDA marginsResults expected to have a positive outcome on the Definitive Feasibility Study (‘DFS’) on track to complete Q4 2019, aiding transition from exploration to mining phase

Nick Johansen Director of Armadale said:Transitioning from explorer to emerging miner is now the Board’s core focus in the lead up to completion of the DFS and beyond. Consequently, we are delighted that the first four assay results from the current RC drilling programme demonstrate exceptional grades with near surface large mineralised intercepts. The immediate takeaway is two-fold: firstly, higher than average grade; and secondly, the potential for low extraction costs given the mineralisation is near surface.

“The results received to date continue to point to a potentially viable graphite mine and verify the Board’s commercialisation plans which are progressing positively. As such, we look forward to further updating the market as we accelerate our plans to commission the Mahenge Liandu Graphite Project.”

MAHENGE LIANDU GRAPHITE PROJECT, TANZANIA

Armadale’s wholly-owned Mahenge Liandu Graphite Project is in a highly prospective region, with a high-grade JORC compliant indicated and inferred mineral resource estimate announced February 2018 – 51.1Mt at 9.3% TGC. This includes 38.7Mt Indicted at 9.3% and 12.4Mt at 9.1% TGC, making it one of the largest high-grade resources in Tanzania.

Work to date at the Project has demonstrated its potential as a commercially viable deposit, with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

An 18-hole reverse circulation (‘RC’) drill programme totalling 958m is currently underway; assay from the first four drill-holes totalling 262m have been received:

HoleID

East

North

Elevation

Depth

From

To

Difference

TGC%

Grade Thickness

Including

LDRC0050

251818

9035117

593

52

0.0

39.0

39.0

11.2

39m@11.2% tgc

7m@16.9% from 31m

LDRC0051

251783

9035216

643

67

0.0

57.0

57.0

7.64

57m@7.64%

7m@16.78% from surface

LDRC0052

251744

9035287

672

79

12.0

75.0

63.0

7.99

63m@7.99%

 

LDRC0053

251717

9035358

686

64

22.0

31.0

9.0

14.76

9m@14.76%

9m@14.75% from surface

251717

9035358

686

64

36.0

60.0

24.0

5.04

24m@5.04%

Additionally, eight diamond drill-holes have also been drilled and are currently being assayed.

Upon completion of the current infill drilling campaign focused on the initial mine pit, the Company expects to improve defining mineralisation, provide critical data for resource modelling and design an optimal mine.

Armadale remains on track to complete a DFS at the Project in Q4 2019. This has been based on the results of a Scoping Study completed in March 2018, which verified that the Mahenge Liandu Project could produce a coarse flake, high-purity graphite product underpinning a compelling business case to progress commercialisation plans. Based on a 400,000tpa throughput, the study highlighted the following key positive metrics:

Producing an average of 49,000tpa of high-quality graphite products for a 32-year mine lifeNear surface nature of deposit produced a low 1:1 strip ratio for the life of the mineLow operating cost of US$408/t, based on an average 12.5% TGC grade for the life of the minePre-tax IRR of 122% and NPV of US$349m, with a low development capex of US$35mMaximum draw-down during the construction of the project is US$34.9m and the after-tax payback period is 1.2 yearsThere remains significant scope to further improve returns, with staged expansions as the current mine plan is based on circa 25% of the total resource

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

**ENDS**

For further information, please visit the Company’s website www.armadalecapitalplc.com, follow Armadale on Twitter @ArmadaleCapital or contact:

Enquiries:

 

Armadale Capital Plc

Paul Johnson, Non-Executive Director (UK)

Tim Jones, Company Secretary

+44 (0) 20 7236 1177

Nomad and broker: FinnCap Ltd

Christopher Raggett / Max Bullen-Smith

+44 (0) 20 7220 0500

Joint Broker: SI Capital Ltd

Nick Emerson

+44 (0) 1483 413500

Press Relations: St Brides Partners Ltd

Isabel de Salis / Juliet Earl

+44 (0) 20 7236 1177

 

Notes

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant Indicated and inferred mineral resource estimate of 51.1Mt @ 9.3% TGC, making it one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu’s potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Other assets Armadale has an interest in, include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

View source version on businesswire.com: https://www.businesswire.com/news/home/20190624005531/en/

Copyright Business Wire 2019

Date   Source Headline
19th Jul 20177:00 amBUSExploration Update at Mahenge Liandu Graphite Project, Tanzania
13th Jul 201712:01 pmBUSConvertible Note Update
4th Jul 20172:31 pmBUSTanzanian Legislation
26th Jun 20174:35 pmBUSResult of AGM
26th Jun 20177:00 amBUSAGM Statement
21st Jun 20177:00 amBUSExploration Update: Trenching Intercepts Wide Zones of High Grade Graphite
5th Jun 20177:00 amBUSUpdate on 2017 Exploration Programme at Mahenge Liandu Graphite Project
2nd Jun 20177:00 amBUSFinal Results
3rd May 20177:00 amBUSGraphite Concentrate Upgraded to Purity of up to 99.99% Graphitic Carbon
21st Apr 20179:31 amBUSExcellent Test Results for Mahenge Liandu Graphite Concentrate
29th Mar 20177:00 amBUS2017 Mahenge Liandu Exploration Programme Commenced: Targeting Resource Increase and Upgrade
28th Feb 201712:47 pmBUSDirectorate change
2nd Feb 201711:45 amBUSInitial Metallurgical Test-work Results
23rd Jan 20172:16 pmBUSDirector/PDMR Dealing
20th Jan 20174:12 pmBUSNew Corporate Website - Replacement
20th Jan 20173:40 pmBUSNew Corporate Website
18th Jan 20177:00 amBUSPlacing to Raise £650,000
5th Jan 20177:00 amBUSNumber of Shares in Issue
8th Dec 20167:00 amBUSMaiden JORC Compliant Mineral Resource Estimate of 40.9Mt @ 9.41% Total Graphitic Content
5th Dec 20167:00 amBUSJoint Venture Agreement Proceeding on Mpokoto Gold Project
11th Nov 201610:00 amBUSHolding(s) in Company
8th Nov 20167:00 amBUSInitial Assay Results Confirm High-Grade Graphite Mineralisation up to 26% TGC
2nd Nov 20169:45 amBUSHolding(s) in Company
26th Oct 20167:00 amBUS85% Strike Rate of High Grade Graphite Mineralisation from Drilling at Mahenge Liandu, Tanzania
18th Oct 20167:00 amBUSPositive Drill Results from Mahenge Liandu Graphite Project
18th Oct 20167:00 amBUSDirectorate change
11th Oct 20167:00 amBUSIssue of Equity
7th Oct 20167:00 amBUSDiscovery of High-Grade Coarse Flake Graphite Mineralisation Mahenge Liandu Project
28th Sep 20167:39 amBUSBinding HOA to Form Joint Venture to Develop Mpokoto and Directorate Change
23rd Sep 20167:00 amBUSDrilling Commences at the Mahenge Liandu Graphite Project, Tanzania
22nd Sep 20167:00 amBUSInterim Results
16th Aug 20167:00 amBUSGeological Mapping Identifies Extensive Outcropping Mineralisation at Mahenge Liandu Graphite Project, Tanzania
10th Aug 20167:00 amBUSDirectorate Change
28th Jul 20168:00 amBUSDirector/PDMR Shareholding
25th Jul 20167:00 amBUSEM Survey Defines Multiple Drill Targets at Mahenge Liandu Graphite Project, Tanzania
21st Jul 20167:00 amBUSDirectorate change
13th Jul 20169:35 amBUSHolding(s) in Company
11th Jul 20167:00 amBUSCompletes Acquisition of High Grade Graphite Project in Tanzania
24th Jun 201611:35 amBUSResult of AGM
23rd Jun 201612:00 pmBUSRaises £825,000 to Advance High Grade Liandu Graphite Project, Tanzania
20th Jun 201611:30 amBUSHigh Grade Graphite Mineralisation Confirmed at Liandu Project
2nd Jun 20167:00 amBUSProposed acquisition of a High Grade Coarse Flake Graphite Project in Tanzania
20th May 20167:00 amBUSFinal Results and Notice of AGM
3rd May 20167:00 amBUSArmadale Capital Plc (‘Armadale’ or ‘the Company’) Update on Exploration Programme at Mpokoto
7th Apr 201611:00 amBUSHolding(s) in Company
21st Mar 20164:15 pmBUSHolding(s) in Company
16th Mar 20163:40 pmBUSHolding(s) in Company
9th Mar 20167:00 amBUSPlacing & Planned Exploration Programme at Mpokoto
22nd Feb 20163:19 pmBUSRepayment of Loan
9th Feb 201611:32 amBUSRobust Project Demonstrated by Mpokoto Feasibility Study - Replacement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.