Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.30
Bid: 2.20
Ask: 2.40
Change: -0.10 (-4.17%)
Spread: 0.20 (9.091%)
Open: 2.40
High: 2.35
Low: 2.25
Prev. Close: 2.40
AAU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

2020 PRODUCTION GUIDANCE

19 Mar 2020 07:00

RNS Number : 7014G
Ariana Resources PLC
19 March 2020
 

 

 

 

 

 

 

19 March 2020

AIM: AAU

 

2020 PRODUCTION GUIDANCE

 

Ariana Resources plc ("Ariana" or "the Company"), the AIM-listed exploration and development company operating in Europe, is pleased to announce its production guidance for 2020 for the Kiziltepe Mine ("Kiziltepe" or "the Project"). Kiziltepe is part of the Red Rabbit Joint Venture ("JV") with Proccea Construction Co. and is 50% owned by Ariana through its shareholding in Zenit Madencilik San. ve Tic. A.S. ("Zenit").

 

Highlights:

 

· Gold production guidance for 2020 from Kiziltepe is c. 18,000 oz Au*, c. 30% above feasibility plan for this stage of the operational mine life.

 

· The mine plan forecasts average monthly production of approximately 20,000 tonnes of ore, peaking during Q2 2020.

 

· Ore throughput to the mill during 2020 is expected to be c. 205,000 tonnes, which represents a 37% increase over the feasibility plan.

 

· Average grade of gold to be mined during the year is expected to be c. 2.5 g/t Au and gold recovery is expected to exceed 90%.

 

· Open-pit mining will be completed at the Arzu South pit by Q3 2020, and mining transitioned completely to the Arzu North and Derya areas.

 

Dr. Kerim Sener, Managing Director, commented:

 

"Our production guidance for 2020 follows a record-breaking quarterly operational update announced on 21 February 2020. During Q1 2020, the mine has continued to perform very well, with production now simultaneously occurring between both the Arzu South and Arzu North open pits. With the addition of lower grade ore and higher mining rates required from the satellite pits, such as Arzu North, we are expecting output to reach 18,000 oz in 2020. Importantly, this is a substantial increase over our feasibility forecasts for this stage of the operation.

 

"At the end of this month, repayments of the US$33 million JV capital loan to Turkiye Finans Katilim Bankasi A.S. will reach US$32.8 million or 99% of the loan balance. Completion of the loan repayments will allow the JV to develop several strategies to increase total production and life of mine. These strategies have included planning associated with expanding mill throughput, investigating opportunities for expansion of our open pits and examining preliminary planning and design work required for potential underground operations. Associated resource estimation and optimisation work has yielded encouraging results, which we will expand upon in due course.

 

"It is important for us to note recent market developments, notably the significant reduction in the price of oil, which will have a positive effect on our mining and processing costs. Meanwhile, the gold price has continued to remain at levels substantially higher than feasibility forecast. These, along with other positive trends including the declining value of the Turkish Lira, reinforce the economics of the Kiziltepe operation.

 

"Lastly, we are pleased to note that the mine is taking extensive precautions against Coronavirus (COVID-19), including staggered mess hours and increased medical checks. At this time, we are not anticipating disruption to our production schedule but if this situation changes then we will inform the Market."

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

* Silver production guidance is not provided, as silver is treated as a by-product credit.

 

Summary of Project

 

The Kiziltepe operation is currently expected to deliver approximately an average of 20,000 oz gold equivalent per annum over eight years of initial mine life, for a total of up to 160,000 oz gold equivalent based on current resources. The operating company, Zenit Madencilik San. ve Tic. A.S. (50:50 JV between Ariana and Proccea) will continue to make repayments against its loan from Turkiye Finans Katilim Bankasi A.S. based on a contractual schedule. Construction capital loan repayments will have been completed by April 2020 and, during this time, excess cash-flow from the operation is being used to make proportional repayments of loans provided by Ariana and Proccea jointly to the JV for exploration and development respectively. After the repayment of all loans, profits from the operation will be shared on a 51:49 basis between Ariana and Proccea respectively.

 

Commercial production was initiated at Kiziltepe during July 2017 and formal quarterly production reporting commenced. The Company also completed a new resource estimate for the project based on recent drilling and geological interpretation. Detailed technical and economic assessments will be completed on several satellite vein systems which are not currently in the mining plan, in anticipation of these being developed in future years. The Company is currently targeting a minimum ten-year mine life, which will require the addition of a further 40,000 oz gold equivalent in reserves outside of the four main pits (Arzu South, Arzu North, Banu and Derya) that are currently scheduled to be mined. Management is confident that this can be achieved assuming the conversion of existing resources to reserves.

 

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

 

Kerim Sener, Managing Director

 

 

 

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

 

 

 

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7886 2500

James Stearns / Atholl Tweedie

 

 

 

Yellow Jersey PR Limited

Tel: +44 (0) 20 3004 9512

Dom Barretto / Joe Burgess / Henry Wilkinson

arianaresources@yellowjerseypr.com

 

 

Editors' Note:

 

About Ariana Resources:

 

Ariana is an AIM-listed mineral exploration and development company operating in Europe. It has interests in gold production in Turkey and copper-gold assets in Cyprus. The Company is developing a portfolio of prospective licences in Turkey, which contain a total of 1.6 million ounces of gold and other metals (as at end-2017).

 

The Red Rabbit Project is comprised of the Company's flagship assets, the Kiziltepe and Tavsan gold projects, and is part of a 50:50 Joint Venture with Proccea Construction Co. Both assets are located in western Turkey, which hosts some of the largest operating gold mines in the country and remains highly prospective for new porphyry and epithermal deposits. The Kiziltepe Sector of the Red Rabbit Project is fully permitted and is currently in production. The total resource inventory at the Project and its wider area is c. 605,000 ounces of gold equivalent (as at end-2017). At Kiziltepe a Net Smelter Return ("NSR") royalty of up to 2.5% on production is payable to Franco-Nevada Corporation. At Tavsan an NSR royalty of up to 2% on future production is payable to Sandstorm Gold.

 

The 100% owned Salinbas Gold Project is located in north-eastern Turkey and has a total resource inventory of c. 1 million ounces of gold equivalent. The project comprises three notable licence areas: Salinbas, Ardala and Hizarliyayla, all of which are located within a multi-million ounce Artvin Goldfield. The "Hot Gold Corridor" contains several significant gold-copper projects including the 4Moz Hot Maden project, which lies 16km to the south of Salinbas and 7km south of Hizarliyayla. A NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation on the Salinbas Gold Project.

 

Ariana is also earning-in to 50% of UK-registered Venus Minerals Ltd ("Venus"). Venus is focused on the exploration and development of copper-gold assets in Cyprus.

 

Panmure Gordon (UK) Limited are broker to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

Ends.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDDVLFFBXLLBBE
Date   Source Headline
30th Dec 202012:29 pmRNSRESULT OF GENERAL MEETING
14th Dec 20207:01 amRNSINVESTOR WEBINAR
14th Dec 20207:00 amRNSPUBLICATION OF CIRCULAR AND GENERAL UPDATE
9th Dec 202012:45 pmRNSDirector/PDMR Shareholding
7th Dec 20208:00 amRNSINCREASE IN JORC RESOURCES AT THE MAGELLAN PROJECT
7th Dec 20207:00 amRNSJOINT VENTURE CONDITIONAL AGREEMENTS COMPLETED
2nd Dec 20207:00 amRNSCONDITIONAL AGREEMENT TO SELL SATELLITE PROJECTS
23rd Nov 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
6th Nov 20207:00 amRNSDirector/PDMR Shareholding
5th Nov 202012:28 pmRNSHolding(s) in Company
30th Oct 202010:49 amRNSUPDATE ON PROPOSED JOINT VENTURE
27th Oct 20209:38 amRNSDirector/PDMR Shareholding
27th Oct 20207:00 amRNSDirector/PDMR Shareholding
20th Oct 20207:00 amRNSARIANA LAUNCHES NOT-FOR-PROFIT INITIATIVE
15th Oct 20207:00 amRNSMAIDEN JORC RESOURCE AT MAGELLAN PROJECT, CYPRUS
12th Oct 20207:00 amRNSQ3 2020 PRELIMINARY PRODUCTION RESULTS
30th Sep 20207:00 amRNSINTERIM RESULTS
29th Sep 20207:00 amRNSUPDATE ON PROPOSED JOINT VENTURE
2nd Sep 20207:00 amRNSNEW HIGH-GRADE VEIN DISCOVERED AT KIZILTEPE
28th Aug 202012:30 pmRNSResult of AGM
27th Aug 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
20th Aug 20207:00 amRNSIssue of Shares
10th Aug 20207:47 amRNSDirector/PDMR Shareholding
6th Aug 20207:00 amRNSDirector/PDMR Shareholding
4th Aug 20208:30 amRNSREVISED AGREEMENT WITH KEFI MINERALS PLC
30th Jul 20207:00 amRNSMAJOR RESOURCE UPDATE: SALINBAS PROJECT
28th Jul 20207:30 amRNSINVESTOR WEBINAR
28th Jul 20207:00 amRNSFINAL RESULTS FOR THE YEAR 31 DECEMBER 2019
9th Jul 20207:00 amRNSQ2 2020 PRELIMINARY PRODUCTION RESULTS
1st Jul 20207:00 amRNSCOMMITMENT BY ÖZALTIN HOLDING A.S.
29th Jun 202012:48 pmRNSFINAL RESULTS AND AUDIT UPDATE
15th Jun 20207:00 amRNSIVRINDI LICENCE AND METALLUGICAL UPDATE
11th Jun 20207:49 amRNS50% INCREASE IN TAVSAN RESOURCE
26th May 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
13th May 20207:00 amRNSCOMPLETION OF INITIAL EARN-IN ON VENUS MINERALS
11th May 20207:00 amRNSKIZILCUKUR JORC RESOURCE UPDATE
7th May 202012:34 pmRNSSHAREPROPHETS SHARES CONFERENCE 2020
1st May 202010:55 amRNS100% REPAYMENT OF CAPITAL LOAN
30th Apr 20201:30 pmRNSEXTENSION AGREEMENT
23rd Apr 20202:05 pmRNSSecond Price Monitoring Extn
23rd Apr 20202:00 pmRNSPrice Monitoring Extension
23rd Apr 20207:00 amRNSSIGNIFICANT RESOURCE UPDATE: KIZILTEPE
15th Apr 20207:00 amRNSQ1 2020 PRELIMINARY PRODUCTION RESULTS
2nd Apr 20207:00 amRNSKEPEZ RESOURCE DEVELOPMENT UPDATE
1st Apr 20207:00 amRNSDUE DILIGENCE UPDATE
26th Mar 20207:00 amRNSMAIDEN DIVIDENDS FROM SUBSIDIARY
24th Mar 20202:05 pmRNSSecond Price Monitoring Extn
24th Mar 20202:00 pmRNSPrice Monitoring Extension
24th Mar 202011:06 amRNSSecond Price Monitoring Extn
24th Mar 202011:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.