On 27 November, Pan African Resources (PAF) announced that it had completed two studies on its Soweto tailings storage facilities near the MTR/Mogale plant, namely a 1Mtpm standalone carbon-in-leach plant, for which a definitive feasibility study (DFS) was completed, and a 600ktpm expansion circuit to be added to the existing MTR/Mogale operation, for which a pre-feasibility study (PFS) was completed. Of the two, the 600ktpm option is favoured and has therefore progressed to DFS level, expected to be completed in June. In the meantime, the PFS posits annual gold production of c 30–35koz for 15 years at an all-in sustaining cost (AISC) of US$1,000–1,200/oz. At a gold price of US$2,800/oz, this generates a post-tax net present value (NPV13...