RE: Tamboran increase Beetaloo Basin 2C gas resources to 2.0 TCF27 Sep 2023 05:30
• Tamboran has booked its first estimate of contingent gas resources in the 100 per cent owned and operated EP 136 acreage in the Beetaloo Basin following a review of drilling results from the Maverick 1V (M1V) well.
• EP 136 unrisked 1C contingent gas resources increase to 116 billion cubic feet (BCF) and unrisked 2C contingent gas resources increase to 406 BCF.
• EP 161 unrisked 1C contingent gas resources increase to 91 BCF and unrisked 2C contingent gas resources increase to 470 BCF.
• Across EPs 76, 98, 117, 136 and 161, Tamboran’s total company unrisked 1C contingent gas resources have increased by 37 per cent to 458 BCF and unrisked 2C contingent gas resources have increased by 32 per cent to 2.0 trillion cubic feet (TCF).
• The resource upgrade has been evaluated and certified by leading independent third-party resource certifier Netherland, Sewell & Associates, Inc. (NSAI), with an effective date of 30 June 2023.
• Revised contingent gas resources do not incorporate results from the recently drilled Shenandoah South 1H (SS1H) well in EP 117. Tamboran plans to evaluate the resources surrounding the SS1H location following flow testing, which is expected in Q1 2024.