RE: Costing20 Dec 2025 04:44
The "missing holes" of BH1-45 , by the drilling update (RNS 30th Oct which you have read) stated 20 holes had been drilled and awaiting results back from assay, to be published mid November (they were published 17th Nov so hardly not keeping to time or newsflow) I think in a video CL stated they were wanting to get some results from the Rhyolite dome included, so were also waiting for that but can be seen in the 17th Nov RNS as BHR.
So that at least means by the time results published on 17th Nov, up to BH45 (and that is just a number quoted in the results, it equally does not mean that is the final hole) at least 25 had not been drilled.
With one drill I think they average 10 holes per month. In a video CL quoted one every two days, so without working weekends etc that probably is approx correct
You do need to read the details within the RNS, especially if this is the only news channel you choose to follow.