RE: 3 months contract?20 May 2026 10:01
Rudyard Commercialisation:
The company recently secured a 3-month spot sales arrangement with an industrial gases group, committing 100% of available output (30 to 40 Mcf per day) at prevailing spot rates.Ultra-High Purity:
The Rudyard project is designed to produce 99.999% ultra-high purity helium. This opens lucrative doors in high-tech manufacturing, aerospace, and semiconductor industries, elevating it beyond standard balloon-grade helium.Analyst Consensus:
City analysts have an average target price of 93p for the stock, indicating a significant potential upside if production ramps up successfully.