RE: Q 4 Alan201712 Nov 2018 07:40
A thought, a fleeting moment of inspiration and wrong. LOL I thought they could plug the bottom formations and blow the kimmeridge, Idea was from, the information at Lidsey, as they tested the Kimmeridge there even though the well was drilled a lot deeper. and also that P.Vonk has said around two weeks, A side track ! Well, our current timings could be 2 months to two years for a side track. Well! there you have it. I'm glad your here. :)