Dire update29 Sep 2022 11:23
"Once consistent production is established and Rukwa becomes a reliable source of coal "
*** So no consistent production and not a reliable source of coal
"Following extensive servicing and repairs on the main machinery and wash plant at the Rukwa site, and the purchase of two additional trucks, final works are expected to be completed shortly, with production recommencing"
*** So production has stopped and needs to be recommenced
"achieve up to 4000 tonnes by the end of October 2022. The targeted production and sales increase to 6,000 tonnes per month of washed coal is expected to take place after the rainy season ends in March/April 2023."
*** There we go, the rainy season gets the blame again. "UP TO 4,000 tonnes" so 1 tonne would satisfy that criteria by end of October then they can improve this to 6,000 for possibly 5 or 6 months because of the rainy season!!!!"
Less than, on average, £10,000 revenue a month for the six month period ended 30 June 2022
If Brahma have 70 transport vehicles (not saying they are trucks) "Brahma are a local mine operator and commercial and logistics specialist having up to 70 transport vehicles on the roads of Tanzania. " why are Edenville buying two trucks "and the purchase of two additional trucks"
Appalling update, jam tomorrow again.
1. Production needs to restart
2. No consistent production and not a reliable source of coal
3. Might get 4,000 tonnes by end of Oct, if they restart production
4. Given themselves 6 months to get to 6,000 and blame the wet season
5. Bought two trucks (£££) even though Brahma have taken over and they have 70 vehicles
Sub 10p coming and a placing before the end of the year. Agree, bottom drawer and at the back of the bottom drawer. See everyone in 6 months.