RE: If the drilling company have announced26 Jan 2021 23:15
The wellplan has probably changed a few times and that would explain a change in the number of days required to drill it...complexity, hole size, casing size if required would all have a bearing on days ...
1 firm well is interesting though as it does suggest there has been talk of more... and if they could be in the pipeline, but not in November ?
Could they sidetrack the 6 well to the” attic “ at the same time and have two pumping from the attic. All the kit would be on the rig to do it after the first one.
I think this is doable especially if they beat the curve on the first sidetrack cause by then 6 production will be reduced ..
Water injector to me seems foolhardy ...