RE: Block Energy6 Aug 2022 13:42
Hi
Paul said the following on 24/02/22 RNS
Plans for the drilling of the previously announced side-track at well WR-B1 are well advanced, with long-lead items having been ordered. The well is being funded from existing cash from current production.
If Paul can say something like above and get away,
He will tell anything and “LIE”market,
Please revisit anything he says.
Therefore please stop posting “for the sake of posting”
This place is not a joke.
Hope you all are not linked to”open check book journalism “