RE: Say David an Joe get voted out.11 Jun 2026 14:49
I recall someone at Egdon telling me some years ago that the Keddington sidetrack would need to be drilled a long way to the east of the field to reach an undrained part of the reservoir. In their opinion it was quite high risk, and would be fairly expensive, so probably of the order of £2 million these days. With a 55% interest, UJO's share would be at least £1 million. This may explain why there is no great rush to drill it.