Angus18 Apr 2023 10:50
Surprised it’s down, successful well drilling, completion and well test, combined with high anticipated flow rates being successfully achieved and then an increase likely in these flow rates, combined with a production hook up already in place and to be increased to a permanent flow line. Makes no sense. Can anyone advise on the lastest reservoir p50 reserve volumes anticipated for the sidetrack?