RE: Up, Up, Up - Capital Drilling Profit Soars Thanks To Centamin21 Mar 2023 03:45
If you have a technical report on reserves, a discussion of exploration results is part of it. However, the report would also include the overall geological model, the outline of the deposit, the resources and their level of confidence, how it would be mined, the conversion factors (mining recovery and dilution), processing, production schedule both for mining and processing, cost structure and a cash flow model, preferably on an annual basis.
Observations from another shareholder Dasut and former mining professional who supplied heavy plant to Sukari from the early days
With a strip ratio over 10 to 1 their costs are currently much too high and this is where I would like to understand in more detail the cost per ounce of Capital's waste removal.
This will then hopefully provide us with something to look forward to at the end of the contract, a more realistic strip ratio and reduced cost per tonne/ounce. Or will it and is this high strip ratio more realistic given the age of the open pit?
Dear Mr Horgan,
I do hope that you will take these observations and suggestions in the spirit in which they are offered and after due consideration that you are able to reply to me with your thoughts and some reassurance that this time things really are different and we shareholders aren’t going to let down as on numerous occasions in the past prior to your arrival.
The above part of a letter 26/07/2022 below which remains unanswered!