RE: Wn or bust.25 Sep 2020 11:29
Krull there will only be one rig. There will be a crane on site for initial set up but that will go once the drilling rig up is completed. The casing sizes are all industry standard. 30” conductor, 13 3/8” casing, 9 5/8” casing, 7” Liner, then could be followed by 4 1/2” liner or left open hole. The sizes can change depending on well engineering. The rig is an ok rig but can be a bit slow. Not a lot will be worth noting during the first few weeks. Things will get exciting when they drill into the first target, I fully expect them to run open hole Wireline logs across that section. So keep an eye out on twatter for a logging truck arriving on site.