Was it that bad ?26 Jul 2019 20:05
Bloe today :
Resumption of production at West Rustavi well 16aZ
Block is pleased to announce the resumption of production at well 16aZ at its flagship West Rustavi field. Production resumed on 11 July and since testing began the Well has produced at an average rate of approximately 360 boepd (295 bopd plus 390 Mcf/d) on varying choke sizes, with an average water cut of 25%, considered to be mainly returned drilling fluid.
Paul Haywood, Block Energy Chief Executive Officer, said: 'We are pleased to resume production at well 16aZ and look forward to establishing with due caution a stable production rate for our best performing well to date. The Well produced exceptional test rates earlier this year and offers excellent netbacks of $35/bbl at $65/bbl Brent.
'With the resumption of production at well 16aZ our fully-funded back-to-back multi-well drilling programme continues to gather momentum. We now keenly anticipate ramping up production with the sidetracking this summer of well 16aZ's neighbouring well, 38Z. Three of West Rustavi's other wells will also be sidetracked in the Middle Eocene structure, and two of them tested for their historic gas discoveries in the Lower Eocene. We also look forward to acquiring a 3D seismic survey that will identify optimal locations for new horizontal oil and gas wells across the Field and support an upgrade of the Company's CPR, prepared back in January 2018.'
Read the RNSCopyright © 2019 Block Energy Plc, All rights reserved.
You are receiving this email because you opted in via our website.
Add us to your address book
Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.
Delete
Move to
Forward
Reply