RE: Prospectus & CPR21 Jul 2023 21:33
James
Re: pipeline connection to the network.
Check out PXEN.
Recently paid SNAM to lay a 1000m underground pipeline in the Po Valley, Italy.
The (4inch I think) pipeline connected a gas well to the Italian grid. Came in at under β¬1m I believe. Not bad considering the bureaucracy/ labour costs.
So worst case around 5x that for 5km in the desert (most likely a FRACTION of given the locale)
But still,,, β¬5m is peanuts really IF necessary.
They'll get it all back and then some, anyway.