I know its not ggp, but ws reading yesterday (in Forbes magazine, hardly a hotbed for Conspiracy) Obama bought 1.6 billion dum dum bullets, illegal to use them outside the USA, truly frighteneing. atb. Lets hope ggp flies
Primary Nanushuk targets (topsets) intersected between 4,667' and 4,901' (approx. 240 ft of interval)
The previously reported (1st March 2019) interim results were related to an interval in the Nanushuk Formation above the primary target zone. This interval (4,460'-4,530') remains the subject of further analysis to determine prospectivity. So that's 70 feet of interval
The well successfully intersected the top of the Torok Formation at 4913' (this doesn`t tell us what thei nteval is). The Topset Sequence 4 sandstones (secondary target) were encountered at approximately 6052' (what depth did they drill too)
Would be nice to know the full drill and interval details. Any one any ideas on these, atb
Nice to see (as yet) the recent fundraising shares not being dumped on the market. Maybe these sophisticated investors are looking for than their usual 20% quick return. Fingers crossed for a great result atb
I used to enjoy twis`s posts, monster ramper that he was. Bet he could get this to 7p by Christmas. Is the size of the monkey dependent on how slowly it is approached, if so our monkey will be the size of a juggernaut.
from the interview everything seems on track, however that track is next year, plenty of time for mms to screw us. So wishing for 2p+ by Christmas. Deserves to be much higher than even that.
People have had plenty of time to sell at this price, so why now. Or are they thinking if todays news doesn`t make the sp rise nothing will, so best to bail.
def not the worst as some stocks lose over 90% of their value, but def one of the most boring. Anyway its THURSDAY and only 17 days at the most (according to our BoD) till trigger value day!!!!
yes it could me more dull, see Gunners1 post from earlier he had a lot more zzzzzzzz going on. Might need to wait till the paint has not just dried but begun peeling before we get news, hopefully news before we get our 1st winter snow lol atb
Logged in to say that this is worse than watching paint dry, the paint has actually faded and peeled in the time its taken. But then see the ask has been .35, so does this reduced price mean that good news is finally on the way, especially as volume has ticked up a little..
We`ll know when the news is coming as sp will rise dramatically for a few days beforehand. Aim is that leaky. News could come anytime between now and the end of 2019 beginning of 2020. Its very frustrating as others have said.
the other day I emailed pxog here is the reply The company had guided production in Q2 from Bainet. It change it guidance to Q3 when it announced the 2017 full year results in June to production due to commence in Q3 2018 subject to final permitting consent”.
Based on reports from the operator, Raffles Energy, the Company is happy with the guidance. The final construction permit was awarded some weeks ago and over half the pipeline is laid. The pipe line (2.2km) ties into the Climautil – Bilca flowline and the gas will flow to the Bilca processing plant. The flowline and plant are also operate by Raffles energy.
Whilst getting delayed on 1 out of 7 pf the tier 2 permits was frustrating in the context of getting a European gas well on to production less than a year is a very short time frame. We have just had the 1st anniversary of announcing the farm in. The well was spudded in November. It is the nature of these project that timelines expand and contract as they proceed. I think all parties are frustrate but the operator is progressing hard. Kind regards Edward Dawson
Have emailed pxog the following questions this morning. I will post a reply if and when I get one Like many shareholders I am becoming increasingly frustrated at the lack of news about Romania. The board have told us numerous times that the Romania project would be up and running by the end of June and yet here we are approaching the end of August and still no news. So I would like to ask the following What is the delay? Are all ancillary structures in place? so as once permission is granted it will be just a case of hooking up and pumping the gas. Is all relevant paperwork completed accurately and has it been submitted with no outstanding issues? When are the Romanian authorities next meeting to discuss authorizing the go ahead for the project?
does the underwriting of the NAE cash raise mean sml are confident of the cobre customer re-starting their contract. I appreciate we have money in the back but would have thought most of it was already allocated.