I like the fact we have alot of coppers in a bullish copper market
"Jubilee has secured the rights to approximately 150 million tonnes of copper containing surface tailings, targeted to be upgraded at site and refined at its Sable Refinery in Zambia. This will be done through a joint operation with the mining rights holder. Project Elephant alone holds the potential to produce copper concentrates in excess of the total Sable Refinery capacity of 14 000 tonnes per annum of copper cathode
· Post the period under review Jubilee secured the rights to approximately 2 million tonnes of copper run-of-mine ("ROM") material with the potential of increasing the ROM material to 4 million tonnes, as well as a targeted 2.5 million tonnes of copper containing tailings ("Project Roan")
· Post the period under review Jubilee secured the rights to an additional 115 million tonnes of copper and cobalt tailings. This increases Jubilee's total secured rights to copper and cobalt tailings to approximately 270 million tonnes