RE: Was not expecting results...21 Aug 2018 11:52
Just look at this drill results, “The significance of the more than 42 m of mineralisation intersected by PX036 at depth (87.3 – 130.1 m), including 6.7 metres grading 2.2% TREO to the end of the hole (130.1m), is being evaluated. This was the first hole in the project’s history to be drilled in the area near the summit of Songwe Hill.