Loving it21 Aug 2025 07:35
The drilling contractor has been asked to mobilise enough drill rods to reach depths of over 1,000m for this program and the Company is investigating the possibility of running the drill program on a double shift basis."
Not even wsbn, the contractor wants longer drill rods, greater than 1000m. The contractors are going bonkers too...🚀🚀🚀🚀🚀🚀🚀🚀