RE: So, looking forward.,8 Apr 2022 12:37
Beach,
My understanding of it was that the reformer is clearly being worked on and being tested in the outdoor space. They envisage it, as per Bonds words, being eventually the rough size of a microwave oven which is pretty much the same size as each of the 2.5kW stacks. They are clearly working on a one box solution which will be very neat compared to the Extreme E set up.
It was also interesting to note that during extreme E it has been the batteries that have been struggling with the conditions but the fuelcells have remained robust and without issue.
Jim