production 20196 Jul 2018 12:58
Horse Hill-1 ("HH-1") PEDL137 oil discovery, UKOG 32.435%: Post period end, 150-day extended well test ("EWT") operations commenced at HH-1. The EWT campaign includes three flow and pressure build-up sequences over the Portland, Kimmeridge Limestone 3 ("KL3") and KL4 oil pools, which in 2016 flowed at commercial initial rates of 323, 464 and 901 barrels of oil per day ("bopd") over short stabilised flow periods of 4, 7.5 and 8 hours, respectively. The EWT, if successful, is designed to enable a declaration of commerciality to be made, with first stable oil production targeted in 2019.