RE: F1 Form AIF 202028 Apr 2021 23:06
As of December 31, 2020, Phase 1 of the Miscible Flood Recovery Scheme is substantially online, with eight operational injection wells and thirty-two operational producing wells within the BFU Gas Flood area. As well, most of the required large equipment purchases for purposes of gas flood operations have already occurred.