watch this24 Mar 2019 11:10
jog last in line for drill.advantages, its a hot rig,means its been up and running all snags sorted, its also duel rig, means one is drilling other side getting ready, all the way though the drill sensor are sending back technical data, when depth is reached.jog will put all data with other date and sit down to analyze all date with experts, who have years of knowledge. then decide if verbier is viable,to go into production, you also have cortina still, but bare in mind burchan is up for grabs with 300 mill of oil,witch means verbier could be tapped into cutting the costs down of a platform, so looks like jog could be sat on a little gold mine of black gold