RE: News in August?30 Jul 2022 13:42
Last RNS in May 22:
Tai Prospect
Helium One plans to commence 2022 Phase II exploration drilling operations at the Tai prospect which is the most advanced of all leads and prospects identified in the 3,448km2 Rukwa basin.
Management have been encouraged to select Tai as their primary target by new data taken from the Phase II 2D Seismic campaign acquired in November and December 2021 and processed in early 2022. This interpretation, which is now complete, has not only provided improved resolution over the Tai structural closure, but has also identified a newly defined closure in the Lake Beds which was not previously targeted.
Drilling at Tai is supported by stratigraphic information from the 2021 drilling campaign. QEMSCAN analysis on cuttings has provided information on reservoir distribution, mineralogy, seal potential and grain size of the entire sedimentary sequence at Tai-1/-1A, indicating good to excellent quality reservoir. It also confirms the presence of a thick claystone unit at the top of the Karoo Group as well as the presence of intraformational claystone and calcrete interbeds within the Lake Bed Formation.
The Tai prospect is further understood by the identification of multiple helium shows (helium identified in drilling mud) across all formations but which the Company was unable to log or test with wireline equipment. With a robust structural closure, detailed information on reservoir and seal, and the identification of subsurface helium which proves a working helium system, Tai is the lowest risk prospect in our current AOI of the Rukwa Basin for the Company to focus exploration expenditure with a primary objective of confirming a discovery in the 2022 campaign.
Drilling services
The Company is in detailed discussions with both a rig operator and service companies with the objective of drilling the Tai prospect in Q3/Q4 2022, before the commencement of the rainy season.
The Company has contacted an international drilling rig survey and inspection company to undertake a detailed audit of the proposed rig and its ancillary equipment on location in East Africa.
Further details, including the scope of the drilling program, will be provided once the audit is complete and the contract has been signed.