RE: Tweet 226 Aug 2025 14:30
Who cares about the SP anyway, it'll sort itself out at some point.
3LB's custard slab should be ready for equipment to be place upon it by the weekend. The plant is pretty much modular plus a few connections and then the electrical hook up which if they haven't sorted a permanent supply yet will just have to come from a generator until the permanent supply arrives (might already be there). A week to get the plant together, run some test gas through it, connect the nearest well with a bit of pipe ( sorry, lost track of what one that is) and Bob's your Uncle, well, in my case he actually was - Uncle Bob taught me to drive back in 1974 - vauxhall viva. First production by end of Summer ( mid September could be possible) at a bit if a stretch. Plan it properly, cover the bases, have a plan B, but get it right first time. Keep it Lean.