Predictions23 Aug 2018 14:28
As mentioned in my previous post, i think the SP has reached the bottom. It's possible we will submit the final amendments to ARSO by the end of the month. Which means IPPC permit by the end of September.
The permit required for re-stimulation is a separate issue. I have no idea how long that will take. The sooner the better imho!
SP will touch 1.5p in September and break 2p once IPPC permit is issued. More importantly, it will increase our chances of finding a JV partner.
:-)