Yelemes Deep Structure – 3 wells
Three deep wells are currently live on this structure:
• Deep Well 802 – work ongoing to bring into commercial production. Spud 2022, stuck pipe, work halted Total depth 4200m flowed at 700-900 bopd 100m earlier than expected looking for partners. No further news
• Deep Well 803 – drilled to ~4,200 m; nearing testing. The well had produced for a short period of time at rates of up to 500 bopd from a 10 meter perforated interval within a wider 60 meter interval showing indications of oil between depths of 3,360 and 3,420 meters. Work is underway to install a pump to resume production from this interval.
• Deep Well 701 – planned to follow 803 (per 2026 update). The well is expected to be spudded in Q2 2026 and reach its planned total depth by the end of Q3 2026.
Airshagyl Deep Structure – 3 wells
Three deep wells are currently live on this structure:
• A5 – drilled to 4,442 m; stuck pipe; sidetrack planned. Stuck pipe removal partially successful, 63m interval flowed at 3800 Bopd 19mm choke for 15 days Dec 2017, flowed at 1500 Bopd 12mm choke Feb 2019 for 40 days. New sidetrack from 3769m to 4405m required. No further news.
• A6 – drilled to 4,528 m; chemical treatment planned. At Deep Well A6, which has been drilled to a depth of 4,528 meters, the plan is to drill a 600 meter side track from a depth of 3,800 meters targeting Permian fractured dolomite and anhydrite, subject to rig availability. This is still the plan but no further news.
• A7 – drilling paused at 2,150 m; planned TD 5,300 m. Paused at 2150m to be continued to 5300m Q1 2024 interval of interest at 4000m G70 rig required. Subject to rig availability, this will be the first well to be re-worked in 2026, as per previous RNS.
Block 8 Deeps:- Two licences, Sholkara and Akkuduk .
Sholkara:
Deep Well P1
• Depth: ~3,434 m
• Status: Perforated and under testing
• Notes: Has flowed oil on test at rates up to 270 bopd (earlier RNS) and is being re tested. Work continues to perforate a new 6 meter interval at Deep Well P1 at a depth of 3,467 meters. Work continues
Deep Well P2
• Depth: ~3,415 m
• Status: Actively producing on test
• Notes: Test production has reached ~876 bopd on a 4 mm choke. Earlier tests showed up to 846 bopd. Once P1 completed the rig will then move to Deep Well P2 to drill a 400 meter side track from a depth of 3,100 meters targeting oil in the Permian dolomite.
Akkuduk:
Awaiting licence renewal.
AKD-4:- Reached target depth 3922m awaiting testing Jul 2024 Akkuduk structure.
West Shalva area:-
Wsh-4:- Drilled 1977 depth 3500m oil detected at 1033m 3 other intervals not tested, well outside the Triassic shale West Shalva structure. Now abandoned?
First New well :- Planned depth: 2,660–3,000 m. Spudded: October 2025. Tested an interval at ~2,250 m, producing high‑paraffin oil. Now being deepened to ~3,400 m to test deeper Triassic targets.
Second New Well: Planned depth: ~2,500 m. Expe