Aje Field, OML 113
· The JV Partners are making progress in their development plans for OML 113 and have been advancing plans to replace the current Floating Production Storage and Offloading ("FPSO") to increase gas handling capacity in order to support development plans to monetise the Field's significant wet gas potential (estimated at potentially 1.2 trillion cubic feet ("Tcf") of wet gas resources after redevelopment of the field). *as per AGR Tracs 2019 Competent Persons Report ("CPR")
· Post-period events:
o In July 2022, ADM noted the conclusion of PetroNor E&P Limited's ("PetroNor") acquisition of Panoro Energy ASA's ("Panoro") interest in OML 113, providing a strong endorsement of the quality and considerable potential of the Aje field
o In August 2022, completed the 17th Lifting at the Aje Field totalling 94,187 barrels with a net share of 8,683 barrels to ADM, which equates to ADM's profit interest of approximately 9.2%
Barracuda Field OML 141
· Announced the result of the CPR on the Barracuda Field with a 2U (P50) case, the NPV10 is +$99mm with an IRR of 45%, assuming at least 70mmbbls STOIIP is discovered
· Post-period, in July 2022, the Court extended the injunction secured by ADM to November 2022. The Company entered into settlement talks with Noble Hill-Network Limited ("NHNL")