RE: Brilliant news2 Nov 2022 11:01
From permit application...
Production. It is anticipated that this well will be a producing oil well with little to no gas
production. Surface facilities for the well bores will consist of two wellheads, separators, gas
meters, (2) 400-gallon methanol tank, (2) 400-gallon glycol tank, (6) 300-barrel oil tanks, (2) 300-
barrel water tank, (2) 1000-gallon propane tank (only if needed), a pumping unit with natural gas
fired motor, solar panels, solar chemical, methanol pumps and one trace pump. The prime mover
for pump jacks would be a small (60 horsepower or less), natural gas-fired internal combustion
engine.
A 40-foot pipeline would be constructed from the well pad and tie into a pipeline operated by the
Pacific Energy & Mining Company.
Reclamation. It is anticipated that the 36-3LN-C9 and 36-2LNW-CC wells would stay in
production for up to thirty years.