Newmont/Agnico JV Drilling22 Oct 2022 11:46
Here are the most substantial results from the most recent drill campaign since the start of the JV with Newmont and Agnico Eagle.
Apta (Drilled first due to accessibility and historic drilling)
MAP-072 70.50m @3.53g/t Au, 9.33 Ag and 1.62% Zn
MAP-073 21.60m @ 6.02g/t Au, 6.02g/t Ag and 3.23% Zn
Map-075 37.5m @ 0.72g/t, 1.8g/t Ag, 3.58% Zn
MAP-076 12.25m @ 5.39g/t Au, 1.65 g/t Ag and 0.18 % Zn
MAP-079 23.75m @ 17.40g/t Au, 1.84g/t Ag and 0.19% Zn
MAP-079 0.4m @ 948g/t Au, 57.7g/t Ag, and 0.7% Zn *1kg Gold
MAP-082 29.45m @ 2.50g/t Au, 1.95g/t Ag and 1.08% Zn
MAP-086 18.72m @ 2.85g/t Au, 2.95g/t Ag and 1.59% Zn
MAP-089: 59.55m @ 9.61g/t Au, 6.23g/t Ag and 3.75% Zn
MAP-090: 6.05m @ 9.91g/t Au, 1.56g/t Ag, 0.58% Zn
MAP-091: 61.75m @ 2.05g/t Au, 3.3g/t Ag and 0.82% Zn
MAP- 093: 14.85m @ 1.60g/t Au, 1.08g/t Ag and 0.79% Zn
MAP - 096: 51.55m @ 1.32g/t Au, 1.34g/t Ag and 0.35% Zn
Pepas (All Pepas Strike starts at Surface)
PEP-001: 150.9m @ 3g/t Au, 3.16g/t Ag and 0.15% Zn
PEP-002: 37.25m @ 0.54g/t Au, 0.55g/t Ag and 0.06% Zn
Pep-003: 32.55m @ 0.61g/t Au, 1.2g/t Ag and 0.01% Zn
Pep-005: 36.85m @ 2.13g/t Au, 3.74g/t Ag and 0.07% Zn
Pep-007: 80.55m @ 3.05g/t Au, 2.91g/t Ag and 0.15% Zn
Several Holes due back from Pepas and also one from Pupino prospect. Once Phase 2 is confirmed, negotiations currently underway, the majors will commit a minimum of $20m (they can spend more) over 5 years, though Brad has stated numerous times on recent interviews they intend to complete Phase 2 within 2 years. The previous couple of years of activity at Anza has been hampered by Covid. Now the real drill campaign is about to start, perfect time to invest here in my opinion.