RE: 14 days till first gas1 Jun 2022 11:04
the design of the plant for SFB was by a specialist designer,
all equipment would have been scheduled and specified by the same specialist designer,
all pipework sizes and calcs of pressure drops would have again been calculated by the specialist designer,
SFB was flowing gas prior to the closure of the nearby refinery, which left it stranded.
this is not the same as drilling for oil from the Kimmeridge at brockham.