Read it once more Baldy. Sekisovskoye is being upgraded to 2mtpa. That will be using a shaft they are currently sinking and s second CIL plant.
Baldy, current plant good for 850,000 tonnes. Need more U/G machinery to expand production.....on order....as per latest presentation...
HTTPS://145908.selcdn.ru/files.altyn.uk/presentations/AltynGold%20Investor%20Presentation_Sep14_EN.pdf
I ask myself why people in the know bought in substantially at last fund raise. Altair 146m shares, Pearson 6.6m shares and Aleman dropped royalty claim and increased his holding to 2% of the share capital.
He's not gone anywhere. He's also been a director of that copper Co for 18 months. Your lack of knowledge is embarrassing........
Could be transformational news at any time here, new partnerships to be revealed, new orders or simply Billingham funding agreed.
Our possible funders...
HTTPS://www.antin-ip.com/
Well said Rishi!
Precisely, a red herring being fed by Aandi.
Aandi, please tell us what assets Newry own as listed in their accounts.
Please tell us what assets it owns.....
Aandi, I suggest you read the most recent report and accounts for Newry Biomass. The assets have been used / sold to Northfolk and the Company is in the process of being wound up.
Aandi, can't see why the excitement over Newry Biomass, Eteq have said they are not supporting the company and its being wound up......
Why do EQTEC need NRG ??!!
https://reutersevents.com/events/hydrogen/interview/wood.php
Non exec Chairman put in £100k of his own money and Altair, advised by DP put in over £2m in the placing. Relax.
Current ALTYN AISC $1056, gold at $1775. Go figure
Sekisovskoye underground mine
Plant and equipment
There was a significant investment in plant and
machinery during 2020 and to date in 2021, these
are summarised below:
? Front-end loader ZL 50G
? Dump truck 25t Chaicman
? Material handling trucks CAT R1300 - 3 units
? Underground haulers CAT AD30 - 3 units
? Face drilling rig Atlas Copco T1D
? Ring drilling rig Atlas Copco T1D
? Exploration drilling rig Atlas Copco Diamec U4
? Boomer T1D drilling rig with a capacity of
400m/month
? Boomer T1D long-hole production drill
? Diamec U4 Smart exploration drill rig
? JSB Crawler with a capacity of 1.8cu.m
The company is currently ramping up production to 850k tpa by 2023 with the introduction of new equipment. As underground development progresses, management expects grades to converge from current levels (which are illustrated at depth in last years report and accounts) to Sekisovskoye’s reserve grade of 3.51g/t.
Indominer, please explain to the board what you understand to be "small equipment" and where you obtained the information that states the decline is "undersized".
Currently blasted rock from stopes is loaded out using load-haul dumpers (“LHDs”) into 30t dump trucks, which transport the ore to surface through the main haulage decline. To allow the mine to ramp up to 2Mtpa
a rock hoisting shaft will be sunk. The fact is they are still purchasing equipment in order to achieve full capacity, the infrastructure and equipment being used are industry standard. In March they had to cancel a substantial order for further equipment (drilling rigs and trucks) due to Covid delays.
HTTPS://gov.wales/written-statement-taking-action-make-circular-economy-reality
They have had to downsize the Deeside plant ; pity they haven't told us......