RE: Serinus Energy left Namibia12 Apr 2022 18:17
The best estimate for 2B is 73 bcf, whereas the Inhubesi field close by is reckoned to have over 500 bcf. The projected costs of extracting from Inhubesi is c1.5 billion, so 2B gas possibly won’t be commercial, albeit its closer to the land. Basically, I wouldn’t have a clue of the sp.