RE: So...6 days into the drill......17 Jun 2021 17:51
just checked through those tweets..
June 14th, tweets RNS Commencement of Drilling
June 15th tweets Award of Options
June 16th, Again Tweets RNS Commencement of Drilling..
Drilling started Saturday 12th 4pm local time, so first full day would be Sunday 13th if working that day.
Other than a helium show the other tests will be done after completion of drilling which is estimated to be 1 month.
So my guess is a show some time next week for the 1st target, and the rest of the results around mid July..
"Drilling of the first well is expected to take approximately one month to complete and will produce valuable information about the subsurface. Helium detection will be constantly monitored during drilling to identify helium gas shows from mud logging. On completion, wireline logs will be run to measure formation properties downhole, as well as identifying any pay zones in the success case. Any discovery will be tested with a drill stem test to attempt to flow a sample of gas to surface for grade analysis."