RE: RNS20 May 2021 12:34
nice try ps that rns was from te10 result years ago, this extract was from slumberger q1 2021, even newer technology.
hold your hats
om Schlumberger Q1 2021.
In Algeria, Schlumberger Reservoir Performance executed the first horizontal multistage plug and perforate hydraulic fracture in the tight sands of the Hamra Field, significantly contributing to field production for Sonatrach. The application of an integrated suite of Schlumberger stimulation technologies resulted in gas production exceeding offset wells. Using technologies, including Kinetix* reservoir-centric stimulation-to-production software, WellWatcher Stim* stimulation monitoring service, HiWAY* flow-channel fracturing technique and the ACTive DTS* distributed temperature measurement and inversion analysis, the project delivered increased gas production while reducing required proppant and water volumes. This process accessed gas reserves that would not have been monetizable otherwise, setting a path for further development of tight gas resource in the Hamra and similar fields.