RE: MOU-3 site25 Jun 2023 07:04
CTU. Slipped that one in there casually, Keith :0)
"The coiled tubing unit can run thousands of
meters of continuous joint-free steel pipes (diameter
9~88.9mm) into the production tubing of an oil and
gas well to complete specific workover operations
such as well cleanout, fishing, fracturing, acidification,
etc. or into its casing for logging operations or direct
drilling operations."