RE: I See27 Jul 2018 14:52
On 4 July 2018, Extended Well Testing ("EWT") commenced at T-39 well, by perforation of 21m interval of Zone 19, situated between 2970m and 3000m. After a well clean out, the well started to flow light ( 41.5 API), sweet crude oil together with wet gas and, under natural flow, achieved following production rates: 529 bbls/d of oil and 600,000 scf/d of gas using an 8/64" chock size, 347 bbls/d of oil and 425,000 scf/d of gas using an 7/64" chock size and 250 bbls/d of oil and 350,000 scf/d of gas through 6/64" chock, demonstrating excellent well deliverability. The Company anticipates that production rates from future development wells may be significantly higher.